首页> 外国专利> process for the construction of transport infrastructure underground

process for the construction of transport infrastructure underground

机译:地下交通基础设施建设过程

摘要

The procedure for the construction of underground transport infrastructures, comprises the steps of: excavating an underground transport tunnel (1, 2) comprising a first pipe (1) and a second pipe (2) substantially parallel to one another; making a bypass tunnel (4) connecting the first pipe (1) and the second pipe (2) which comprises the sub-steps of: - introducing a launching chamber (5) along the first pipe (1) up to a first predefined position (PI) chosen along the longitudinal direction (Dl) of the first pipe (1), the launching chamber (5) being able to launch a tunnel boring machine (6); introducing an arrival chamber (7) along the second pipe (2) up to a second predefined position chosen along the longitudinal direction (D2) of the second pipe (2), the arrival chamber (7) being able to receive the tunnel boring machine (6); excavating the bypass tunnel (4) making the tunnel boring machine (6) move forward from the launching chamber (5) to the arrival chamber (7) along a direction transversal (T) to the first pipe (1) and to the second pipe (2).
机译:建造地下运输基础设施的过程包括以下步骤:开挖地下运输隧道(1、2),该隧道包括基本上彼此平行的第一管道(1)和第二管道(2);制作连接第一管(1)和第二管(2)的旁路隧道(4),其包括以下子步骤:-沿着第一管(1)将发射室(5)引入第一预定位置沿第一管道(1)的纵向(D1)选择的压力(PI),发射室(5)能够发射隧道掘进机(6);沿第二管道(2)引入到达室(7)直到沿第二管道(2)的纵向方向(D2)选择的第二预定位置,到达室(7)可以容纳隧道掘进机(6);挖掘旁路隧道(4),使隧道掘进机(6)从发射室(5)沿横向(T)朝第一管道(1)和第二管道的方向向前移动(2)。

著录项

  • 公开/公告号ITMO20130343A1

    专利类型

  • 公开/公告日2015-06-14

    原文格式PDF

  • 申请/专利权人 SWS ENGINEERING S.P.A.;

    申请/专利号IT2013MO00343

  • 发明设计人 CUCINO PAOLO;

    申请日2013-12-13

  • 分类号

  • 国家 IT

  • 入库时间 2022-08-21 15:12:25

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号