首页>
外国专利>
CONSTRUCTION METHOD OF WATERPROOF AND ROOT BARRIER FOR ROOFTOP LANDSCAPE ARCHITECTURE
CONSTRUCTION METHOD OF WATERPROOF AND ROOT BARRIER FOR ROOFTOP LANDSCAPE ARCHITECTURE
展开▼
机译:屋顶景观建筑防水植筋的施工方法。
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a waterproof and root barrier method for a building roof comprising a first step for arranging a base surface; a second step for forming a primer layer; a third step for forming an insulative Styrofoam board layer; a fourth step for forming a polyurethane foam board layer; a fifth step for fixing the Styrofoam board layer and the polyurethane foam board layer to a concrete floor surface using a fastener; a sixth step for forming a fiber sheet layer; a seventh step for joining fiber sheets through a joint using a floor reinforcement tape; an eighth step for forming a first floor waterproofing layer by applying high-viscosity polyurethane; a ninth step for attaching a wall reinforcement tape to the corner; a tenth step for forming a first wall waterproofing layer; and an eleventh step for forming a waterproofing and root barrier layer. The waterproof and root barrier method according to the present invention improves the stability of a waterproofing layer; has excellent root barrier effects; reduces material costs by properly arranging a Styrofoam board and a polyurethane foam board; and reduces construction costs in comparison with a sheet waterproofing and root barrier method by improving workability. [Reference numerals] (AA) Waterproof method flowchart; (BB) Step 1 - arranging a base surface; (CC) Step 2 : forming a primer layer; (D1) Step 3 : forming a Styrofoam board layer; (D2) Step 3-1 : laying a Styrofoam board; (D3) Step 3-2 : coupled with cellophane tape; (E1) Step 4 : forming a polyurethane foam board layer; (E2) Step 4-1 : laying a polyurethane foam board; (E3) Step 4-2 : attaching between polyurethane foam boards; (E4) Step 4-3 : repeating 4-1 step and 4-2 step; (F1) Step 5 : fixing to the bottom of the board; (F2) Step 5-1 : marking a fixed part; (F3) Step 5-2 : punching the marked part; (F4) Step 5-3 : fixing a fastener; (GG) Step 6 : forming a fiber sheet layer; (HH) Step 7 : attaching a floor reinforcement tape; (I1) Step 8 : forming a first floor waterproofing layer; (I2) Step 8-1 : stirring waterproofing materials; (I3) Step 8-2 : coating polyurethane; (I4) Step 8-3 : hardening; (J1) Step 9 : attaching a wall reinforcement tape; (J2) Step 9-1 : sealing with polyurethane; (J3) Step 9-2 : attaching a reinforcement tape; (J4) Step 9-3 : polyurethane immersion on the reinforcement tape; (KK) Step 10 : forming a first wall waterproofing layer; (L1) Step 11 : forming a waterproofing and root barrier layer; (L2) Step 11-1 : mixing after heating; (L3) Step 11-2 : spraying by a spray gun
展开▼