首页>
外国专利>
Caisson type pile manufacture farmland stationary construction manner and the primary excavation process which investigates
Caisson type pile manufacture farmland stationary construction manner and the primary excavation process which investigates
展开▼
机译:沉井式打桩农田固定施工方式及初步开挖过程研究
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To propose a construction method for a large diameter deep foundation, and an earth retaining structure for a large diameter deep foundation, which are never affected by change in ground conditions.;SOLUTION: The construction method of an earth retaining for deep foundation includes: a primary excavation step of digging an excavation hole 2 downwardly; a primary bar arrangement step of arranging first vertical reinforcing bars along a hole wall surface 2a which results from the primary excavation step; a primary spraying step of spraying spray concrete 6 to the hole wall surface 2a; a secondary excavation step of excavating the bottom of the excavated hole 2 to form a space below the first vertical reinforcing bars; a support arrangement step of arranging a ring support 3 in the space; a secondary bar arrangement step of arranging second vertical reinforcing bars along the hole wall surface 2a of the space shallower than the ring support 3; and a secondary spraying step of spraying spray concrete 6 to the hole wall surface 2a shallower than the ring support 3 within the space. The earth retaining structure 1 for deep foundation is constructed by this construction method.;COPYRIGHT: (C)2011,JPO&INPIT
展开▼