首页>
外国专利>
Of the provisional deadline construction method and provisional deadline
Of the provisional deadline construction method and provisional deadline
展开▼
机译:临时期限的建设方法和临时期限
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a construction method of a cofferdam and the cofferdam, capable of easily corresponding to a construction site having a large width, with excellent workability at low cost.;SOLUTION: A construction method of a cofferdam 1 during redevelopment construction for forming a water cut-off space 53 between the upstream side surface of a dam body 51 (a surface 52 on the upstream side of a dam body) and itself to cut-off water infiltrating from the upstream side of the dam body comprises arranging a plurality of cantilever beams 6 in the lateral direction that face the surface across a space and vertically extend with lower ends 8 fixed to the surface to form the water cut-off space 53.;COPYRIGHT: (C)2012,JPO&INPIT
展开▼