首页> 外国专利> Of the provisional deadline construction method and provisional deadline

Of the provisional deadline construction method and provisional deadline

机译:临时期限的建设方法和临时期限

摘要

PROBLEM TO BE SOLVED: To provide a construction method of a cofferdam and the cofferdam, capable of easily corresponding to a construction site having a large width, with excellent workability at low cost.;SOLUTION: A construction method of a cofferdam 1 during redevelopment construction for forming a water cut-off space 53 between the upstream side surface of a dam body 51 (a surface 52 on the upstream side of a dam body) and itself to cut-off water infiltrating from the upstream side of the dam body comprises arranging a plurality of cantilever beams 6 in the lateral direction that face the surface across a space and vertically extend with lower ends 8 fixed to the surface to form the water cut-off space 53.;COPYRIGHT: (C)2012,JPO&INPIT
机译:解决的问题:提供一种围堰和围堰的施工方法,该围堰和围堰的建造方法能够容易地对应于具有较大宽度的施工现场,并且以低成本,优良的可施工性。解决方案:重建工程中的围堰1的施工方法用于在坝体51的上游侧表面(坝体的上游侧的表面52)与自身之间形成阻水空间53,以切断从坝体的上游侧渗透的水。多个悬臂梁6在横向上面向表面,跨过一个空间并垂直延伸,下端8固定在该表面上,形成一个止水空间53。版权所有:(C)2012,JPO&INPIT

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号