首页> 外国专利> PANEL PREFABRICATED KOREAN-STYLE HOUSE STRUCTURE, CAPABLE OF EASILY PREFABRICATING AND REPLACING A KOREAN-STYLE HOUSE STRUCTURE AND IMPROVING A THERMAL INSULATION EFFECT

PANEL PREFABRICATED KOREAN-STYLE HOUSE STRUCTURE, CAPABLE OF EASILY PREFABRICATING AND REPLACING A KOREAN-STYLE HOUSE STRUCTURE AND IMPROVING A THERMAL INSULATION EFFECT

机译:面板预制的韩式房屋结构,能够轻松地预制和替换韩式房屋结构,并改善隔热效果

摘要

PURPOSE: A panel prefabricated Korean-style house structure is provided to easily prefabricate and replace walls and a roof by prefabricating a prefabricated panel and a prefabricated roof manufactured in a factory on a site, thereby reducing a construction period and costs.;CONSTITUTION: A panel prefabricated Korean-style house structure comprises a support bracket(20), a prefabricated panel(30), a finishing foundation stone(40), a finishing pillar(50), a connecting bracket(60), a beam member(70), a post(71), a main ridgepole(80), a lower ridgepole(90), a strip of wood supporting a beam(91), a prefabricated roof(100), and a finishing roofing tile. The support brackets are installed on a top of a foundation plane at a constant interval. The prefabricated panel is installed on a top of the bracket. The finishing foundation stone is installed between the prefabricated panels. The finishing pillar is arranged at a portion where prefabricated panels are touched to each other and vertically installed on the top of the finishing foundation stone. The connecting bracket connects the prefabricated panels. The beam member and post are connected to the connecting bracket. The main ridgepole is installed on the top of the prefabricated panel and the beam member. The lower ridgepole and the strip of wood supporting the beam are installed in the post. The prefabricated roof is installed on the top of the main ridgepole and the lower ridgepole. The finishing roofing tile is installed on the top of the prefabricated roof.;COPYRIGHT KIPO 2012
机译:目的:提供一种预制的韩式房屋预制结构,通过在现场工厂预制预制板和预制屋顶来方便地预制和更换墙壁和屋顶,从而减少了施工时间和成本。板式预制韩式房屋结构,包括支撑支架(20),预制板(30),精加工基石(40),精加工支柱(50),连接支架(60),横梁(70) ,柱子(71),主棱柱(80),下部棱柱(90),支撑梁(91)的木板条,预制屋顶(100)和精加工屋顶瓦片。支撑支架以固定的间隔安装在基础平面的顶部。预制面板安装在支架的顶部。精加工的基石安装在预制板之间。精加工支柱布置在预制板彼此接触的部分处,并垂直安装在精加工基石的顶部。连接支架连接预制板。梁构件和支柱连接到连接支架。主脊杆安装在预制板和横梁的顶部。下部的山脊杆和支撑梁的木条安装在立柱中。预制屋顶安装在主脊杆和下部脊杆的顶部。饰面屋面瓦安装在预制屋顶的顶部。; COPYRIGHT KIPO 2012

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号