首页> 外国专利> METHOD AND SYSTEM FOR RESTARTING A PROJECT MANAGEMENT SYSTEM SCHEDULING ENGINE BASED ON USER INPUT OF CONTRACTUAL START/FINISH DATA

METHOD AND SYSTEM FOR RESTARTING A PROJECT MANAGEMENT SYSTEM SCHEDULING ENGINE BASED ON USER INPUT OF CONTRACTUAL START/FINISH DATA

机译:基于用户的合同起始/完成数据输入重启工程管理系统调度引擎的方法和系统

摘要

agreement on project milestones beginning and / or an automated project management scheduling based on user input data count are provided a method and system for management . Project scheduling engine may be managed by the provision of the start / stop data on the contract . At any point in the scheduling based on the scheduling data on the scheduling engine contract provided by the user of the schedule may restart the project management schedule . Accordingly , the user's schedule is to meet the schedule is optionally suitable for an initial schedule , it is possible to manually schedule the correction or manage one or more portions of the composite without destroying the scheduling dependencies project management schedule .
机译:提供了关于项目里程碑开始的协议和/或基于用户输入数据数量的自动项目管理计划,提供了一种管理方法和系统。可以通过在合同上提供开始/停止数据来管理项目计划引擎。在计划表中的任何时刻,基于计划表用户提供的有关计划引擎合同的计划数据,都可以重新启动项目管理计划表。因此,用户的进度表将满足可选地适合于初始进度表的进度表,可以在不破坏进度依赖项项目管理进度表的情况下,手动地调度校正或管理复合材料的一个或多个部分。

著录项

  • 公开/公告号KR101153018B1

    专利类型

  • 公开/公告日2012-06-04

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20050051333

  • 发明设计人 슐츠 에드워드 제리;

    申请日2005-06-15

  • 分类号G06Q10/00;

  • 国家 KR

  • 入库时间 2022-08-21 17:08:01

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号