首页>
外国专利>
THE INTAKE TOWER CONSTRUCTION METHOD THAT USE A MOLD OF INTAKE TOWER THAT CAN DO FUNCTION OF COFFERDAM AND AN OUTER WALL OF INTAKE TOWER AT THE SAME TIME
THE INTAKE TOWER CONSTRUCTION METHOD THAT USE A MOLD OF INTAKE TOWER THAT CAN DO FUNCTION OF COFFERDAM AND AN OUTER WALL OF INTAKE TOWER AT THE SAME TIME
展开▼
机译:使用可同时实现咖啡渣和进水塔外墙功能的进水塔模具的进水塔施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: An intake tower construction method using a form capable of acting as a cofferdam and an outer wall of an intake tower at the same time is provided to reduce the construction period of an intake tower by removing the need for a separate form for an outer wall of an intake tower. CONSTITUTION: An intake tower construction method comprises the steps of: excavating an underwater bottom for installation of an intake tower(10), setting a foundation form and a water-stop form in the excavated site, placing underwater concrete in the water-stop form, setting a body form in the foundation form, draining water from the body form, placing foundation concrete to form a foundation(200) for the intake tower, setting an inner form and placing concrete in a space formed by the coupling of the body form with the foundation form to form a body portion(300) of the intake tower, coupling a head from to the body form, setting an additional inner form on the inner form and placing concrete to form a tower portion(400) of the intake tower, and curing the concrete and dismantling the inner form.
展开▼