The dike construction work method which uses the geotextile tube and the geothextile tube connection structure
The dike construction work method which uses the geotextile tube and the geothextile tube connection structure
展开▼
机译:利用土工布管和土方伸缩管连接结构的堤防施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A bank construction method using a fabric tube with a connection unit is provided to prevent joint part from being washed away and bank from collapsing, since water is not leaked in a joint. CONSTITUTION: A bank construction method using a fabric tube with a connection unit comprises following steps. An insertion portion(13) is inserted into a tube(10) and a recess portion(14) of both ends of the tube. A rope hangs on a ring portion of a connecting member(20). Filler is inserted into a filler injection port, so the external diameter of the joint is swollen to be nearly equal to the thickness of both tubes. The rope of the connecting member is drawn and connected.