首页>
外国专利>
METHOD OF MANAGING PROJECT BASED ON CAPABILITY MATURITY MODEL INTEGRATION
METHOD OF MANAGING PROJECT BASED ON CAPABILITY MATURITY MODEL INTEGRATION
展开▼
机译:基于能力成熟度模型集成的项目管理方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
CMMI-based project management method according to an embodiment of the present invention, at a first point of time during the execution of the project, the first weight corresponding to the first time point for one or more processes included in the CMMI Calculating the process rate and the reference weight for each process; Calculating a first risk level corresponding to the first time point of the project through the at least one process-specific process rate at the first time point; And updating the first risk with the first weight.;Project, Processor, CMMI, Weights, Risk. monitoring
展开▼