首页>
外国专利>
Method, management procedure, process, an instrument and apparatus for delay estimation and mitigation of delay risks in projects and program
Method, management procedure, process, an instrument and apparatus for delay estimation and mitigation of delay risks in projects and program
展开▼
机译:用于项目和程序中的延迟估计和缓解延迟风险的方法,管理程序,过程,工具和装置
展开▼
页面导航
摘要
著录项
相似文献
摘要
In a method of delay estimation and a project management tool with at least a delay estimation module, the delay estimation module and the method of delay estimation estimating delays at least by dividing a work breakdown structure of a project plan in a plurality of elements, identifying a plurality of risks and uncertainties in connection with the plurality of elements provided in the work breakdown structure, estimating a plurality of best duration uncertainty distributions for each element of the plurality of elements, synthesizing, using the plurality of best duration uncertainty distributions, a work breakdown structure of a project plan with uncertainties, and creating an estimate of delays for the project plan.
展开▼