首页> 外国专利> Handrail preceding type scaffolding curing system and handrail leading type scaffolds using this, as well as the handrail preceding type scaffolding curing method

Handrail preceding type scaffolding curing system and handrail leading type scaffolds using this, as well as the handrail preceding type scaffolding curing method

机译:扶手先行式脚手架固化系统和使用该系统的扶手先行脚手架以及扶手先行式脚手架固化方法

摘要

An object of the present invention and the work that preceded the handrail to the scaffold, promoting and operations that make curing the scaffolding at the same time to shorten the construction period as well as to reduce the construction cost, handrail preceding type scaffolding curing system and this assembled a very safe scaffolding handrail preceding type scaffolds using, as well as to provide a handrail preceding type scaffolding curing method. SOLUTION A scaffolding curing system 1 for use in assembling a foothold in the work site, a pair of guide rails 2 and 2 which is installed along the Ken-waku 11 that constitute the scaffold, a pair of guide rails 2 , and is slid from the bottom along the guide rails 2 and 2 between the 2 handrail and curing the shutter 3 to be installed on the outside of the scaffold, the railing and curing the shutter 3 at a predetermined height of a pair guide rails I and a shutter fixing means 4 for fixing between 2,2. [Selection Figure] Figure 1
机译:本发明的目的和在扶手到脚手架之前的工作,促进和操作使得脚手架同时固化以缩短建造时间并降低建造成本,扶手先行型脚手架固化系统和这使用了组装非常安全的脚手架先行型脚手架,并提供了一种扶手先行型脚手架的固化方法。解决方案:用于在工地中组装立脚点的脚手架固化系统1,沿着构成脚手架的Ken-Waku 11安装的一对导轨2和2,一对导轨2以及从中滑动的一对导轨2和2。在两个扶手之间沿着导轨2和2的底部,并固化将要安装在脚手架外侧的百叶窗3,在一对导轨I和百叶窗固定装置的预定高度处对百叶窗3进行栏杆化和固化。 2,2之间固定的4。 [选型图]图1

著录项

  • 公开/公告号JP4995337B1

    专利类型

  • 公开/公告日2012-08-08

    原文格式PDF

  • 申请/专利权人 山下 博昭;

    申请/专利号JP20110196752

  • 发明设计人 山下 博昭;

    申请日2011-09-09

  • 分类号E04G5/00;E04G21/32;

  • 国家 JP

  • 入库时间 2022-08-21 17:37:08

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号