Post grouting system of Cast-in-place concrete piles and the post grouting method for increasing end bearing capacity at pile base

机译:现浇混凝土桩后注浆系统及提高桩基端承力的后注浆方法

摘要

The present invention provides a method for grouting the contact ground of the cast-in-place concrete pile tip in order to reinforce the tip bearing capacity of the cast-in-place concrete pile and to reduce the amount of settlement of the pile, and the cast-in-place pile used in the grouting method. For a tip post-grouting device.;The tip post grouting device of the present invention is attached to the cast-in-place reinforcing bar network and an even number of transfer pipes (consisting of inlet and outlet pipes) and packers, which transfer grout from the vicinity of the ground to the pile tip, and the L-shaped portion at the tip of the pile It is a structure consisting of a menjet tube connected to both ends of the inlet tube and the outlet tube by the connector.;The post grouting method for reinforcing the site bearing pile tip bearing capacity using the tip post grouting device is based on the construction procedure of a typical large diameter site casting concrete pile. Then, as the tip reinforcing grouting process through the pre-installed grout injection device is added, the bearing capacity of the pile tip ground can be strengthened to solve the problem of reducing the bearing capacity and increasing the settlement amount due to the weakening of the tip, and also simple measurement during the grouting process. It can serve as a simple pile static load test to verify the axial bearing capacity of the pile.;Cast-in-place concrete pile, tip post grouting, tip bearing capacity, menjet tube
机译:本发明提供了一种用于对现浇混凝土桩端部的接触地面进行灌浆的方法,以增强现浇混凝土桩的端部承载能力并减少桩的沉降量,以及注浆方法中使用的现浇桩。用于尖端后注浆装置;本发明的尖端后注浆装置附接到现场浇铸的钢筋网和偶数个输送管(由入口和出口管组成)和封隔器中从地面附近到桩尖的水泥浆,以及在桩尖的L形部分。该结构由通过连接器连接到入口管和出口管的两端的喷射管组成。使用尖端后注浆装置来增强现场支承桩的尖端承载能力的后注浆方法基于典型的大直径现场浇铸混凝土桩的施工过程。然后,由于增加了通过预先安装的注浆装置进行的尖端加固注浆工艺,因此可以增强桩尖地面的承载能力,以解决由于承载能力减弱而导致的承载能力下降和沉降量增加的问题。提示,并且在灌浆过程中也可轻松进行测量。它可以用作简单的桩静载荷测试,以验证桩的轴向承载能力。;现浇混凝土桩,桩端注浆,桩端承载能力,喷射管

著录项

  • 公开/公告号KR101069815B1

    专利类型

  • 公开/公告日2011-10-04

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20080138022

  • 发明设计人 권오성;이종성;

    申请日2008-12-31

  • 分类号E02D5/28;E02D5/34;E02D5/46;

  • 国家 KR

  • 入库时间 2022-08-21 17:49:44