首页>
外国专利>
Construction method of underground grouting structure using vacuum drainage hole between injection hole and control of injection direction of grout material by vacuum drainage
Construction method of underground grouting structure using vacuum drainage hole between injection hole and control of injection direction of grout material by vacuum drainage
展开▼
机译:利用注水孔之间的真空排水孔及注浆材料的注水方向控制的地下注浆结构的施工方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A construction method of a block type underground grout structure including vacuum drain hole formation and grout injection direction control by vacuum drainage is provided to construct a complete underground grout structure without discontinuities. CONSTITUTION: A construction method of a block type underground grout structure including vacuum drain hole formation and grout injection direction control by vacuum drainage is as follows. Injection holes(10) and vacuum drain holes(20) are bored at certain intervals in the ground. The vacuum drain holes are made into vacuum state while injecting grout into the injection holes, thereby leading the grout injected into the injection holes toward the vacuum drain holes. Bulbs are formed by the grout which flows from the injection holes toward the vacuum drain holes. Grout is injected in the vacuum drain holes so that an underground grout structure is formed.
展开▼