首页> 外国专利> FREEZE PREVENTION STRUCTURE FOR RAIL ROADBED AND THIS CONSTRUCTION TECHNIQUE

FREEZE PREVENTION STRUCTURE FOR RAIL ROADBED AND THIS CONSTRUCTION TECHNIQUE

机译:铁路路基的防冻结构及其施工技术。

摘要

The present invention excavates the ground to a certain depth, lay a precast concrete panel on the excavation surface, and after the pile is driven on the precast concrete panel, the casting and curing between the precast concrete panel and the pile with non-concrete concrete Accordingly, an object of the present invention is to provide a freeze protection structure for railway roadbeds and a construction method thereof in which pile and precast concrete panels absorb the expansion pressure due to winter frost, thereby reducing freezing and rising of the track in winter. Railroad roadbed freeze protection structure according to the present invention for achieving the above object is a precast concrete panel having a predetermined width and thickness; A pile driven into the precast concrete panel; A gravel phase in which gravel is laid on the precast concrete panel to a predetermined thickness; PC sleeper that is placed on the gravel top; It consists of a rail fixedly installed by the fastening device on the PC sleeper. In addition, the method for constructing a freeze protection structure for railway roadbed according to the present invention for achieving the above object comprises the steps of excavating the ground to a certain depth to form an excavation surface; Installing a precast concrete panel on the excavation surface; Driving the pile into the precast concrete panel and inserting it into the ground; Placing and curing non-concrete concrete between the precast concrete panel and the pile; Spraying gravel on the precast concrete panel to form a gravel pattern; Laying a PC sleeper on the gravel phase; By sequentially performing the step of installing the rail with a fastening device on the PC sleeper, it characterized in that the construction of the freezing prevention structure.
机译:本发明将地面开挖至一定深度,在开挖面上铺设预制混凝土板,将桩打入预制混凝土板上后,在预制混凝土板与非混凝土桩之间进行浇筑和养护。因此,本发明的目的是提供一种用于铁路路基的防冻结构及其施工方法,其中,桩和预制混凝土板吸收由于冬季霜冻引起的膨胀压力,从而降低了冬季的轨道的冻结和上升。用于实现上述目的的根据本发明的铁路路基防冻结构是具有预定宽度和厚度的预制混凝土板。一桩打入预制混凝土面板;砾石阶段,其中将砾石铺在预制混凝土板上至预定厚度;放置在砾石顶部的PC卧铺板;它由固定装置固定安装在PC卧铺上的导轨组成。另外,为了实现上述目的,根据本发明的用于铁路路基的防冻结构的构造方法包括以下步骤:将地面开挖至一定深度以形成开挖表面;在开挖面上安装预制混凝土面板;将桩打入预制混凝土板并将其插入地面;在预制混凝土板和桩之间放置和固化非混凝土;在预制混凝土板上喷涂砾石以形成砾石图案;在砾石阶段铺设PC卧铺车床;通过依次执行将具有紧固装置的导轨安装在PC轨枕上的步骤,其特征在于防冻结构的构造。

著录项

  • 公开/公告号KR101062732B1

    专利类型

  • 公开/公告日2011-09-06

    原文格式PDF

  • 申请/专利权人 SEOHYUN ENGINEERING CO. LTD.;

    申请/专利号KR20110006200

  • 发明设计人 JUNG BYUNG RYUL;

    申请日2011-01-21

  • 分类号E01B19;

  • 国家 KR

  • 入库时间 2022-08-21 17:49:50

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号