SYSTEM FOR ASSESSING THE ECONOMICAL EFFICIENCY OF CONSTRUCTION SCHEDULE CHANGE OF NEW POWER PLANT
SYSTEM FOR ASSESSING THE ECONOMICAL EFFICIENCY OF CONSTRUCTION SCHEDULE CHANGE OF NEW POWER PLANT
展开▼
机译:新电厂建设计划变更经济效益评估系统
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: a kind of system is used to assess the economy of construction speed, the plant more renewed provide make policymaker so that objective decision economy, by analyzing the variation to construction speed. ;CONSTITUTION: analysis module (20) includes following business efficiency. If construction speed changes, the construction speed changed is corresponded again to without manually recalculating the manpower needed for module (20a) is calculated. Construction cost recalculates module (20b) and executes the construction speed for adjusting construction costs reply variation. Structures of interest recalculates module (20c) estimation structures of interest and is based on recalculating construction cost. ;The 2011 of copyright KIPO submissions