The invention relates to a method of operating a flow line (1) comprising two or more assembly stations (A1, A2, A3, A4, A5, A6) for the assembly of heavy machines such as wind turbine nacelles (3). The method comprising the steps of : installing a prepared assembly trailer (5, 5a, 5b,..., 5n-2, 5n-1, 5n) in the flow line (1) before or at a first assembly station (A1), connecting the said prepared assembly trailer (5, 5a, 5b,..., 5n-2, 5n-1, 5n) to at least one flow line tow bar (37), if the prepared assembly trailer (5, 5a, 5b,..., 5n-2, 5n-1, 5n) is installed before said first assembly station (A1) then: moving the said assembly trailer (5, 5a, 5b,..., 5n-2, 5n-1, 5n) to said first assembly station (A1), else: moving all the flow line assembly trailers (5, 5a, 5b,..., 5n-2, 5n-1, 5n) to the next assembly station (A1, A2, A3, A4, A5, A6), whereby the steps of moving the flow line assembly trailers (5, 5a, 5b,..., 5n-2, 5n-1, 5n) are performed timewise stepwise. The invention also relates to a flow line (1) for the same purpose.
机译:本发明涉及一种操作流线(1)的方法,该流线(1)包括两个或更多个组装工位(A 1 ,A 2 ,A 3 ,A 4 ,A 5 ,A 6 ),用于组装重型机械,例如风轮机机舱(3)。该方法包括以下步骤:在第一装配工位(A <或之前)的流水线(1)中安装准备好的装配拖车(5、5a,5b,...,5n-2、5n-1、5n)。 Sub> 1 ),将所述准备好的组装拖车(5、5a,5b,...,5n-2、5n-1、5n)连接到至少一根流水线牵引杆(37),如果在所述第一组装工位(A 1 )之前安装准备好的组装拖车(5、5a,5b,...,5n-2、5n-1、5n),然后:移动所述组装拖车( 5、5a,5b,...,5n-2、5n-1、5n)移至所述第一装配工位(A 1 ),否则:移动所有流水线装配拖车(5、5a ,5b,...,5n-2、5n-1、5n)到下一个装配工位(A 1 ,A 2 ,A 3 ,A 4 ,A 5 ,A 6 ),从而移动流水线组件拖车的步骤(5、5a,5b ,...,5n-2,5n-1,5n)逐步执行。本发明还涉及用于相同目的的流线(1)。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号