首页> 外国专利> Power plant comprises a steam generator, a steam turbine, a steam pipe that connects a steam outlet of the steam generator with an inlet of the steam turbine, a recirculation line, and heat exchangers

Power plant comprises a steam generator, a steam turbine, a steam pipe that connects a steam outlet of the steam generator with an inlet of the steam turbine, a recirculation line, and heat exchangers

机译:发电厂包括蒸汽发生器,蒸汽涡轮机,将蒸汽发生器的蒸汽出口与蒸汽涡轮机的入口连接的蒸汽管,再循环管线和热交换器

摘要

The power plant comprises a steam generator (15), a steam turbine (18), a steam pipe (22) that connects a steam outlet of the steam generator with an inlet of the steam turbine, and/or a recirculation line (21) that connects an outlet of the steam turbine with a feed water inlet of the steam generator. A first circuit is formed for a first thermodynamic cycle. A first heat exchanger is switched on in the recirculation line at primary side and in a second circulation line at secondary side for a second thermodynamic cycle. The power plant comprises a steam generator (15), a steam turbine (18), a steam pipe (22) that connects a steam outlet of the steam generator with an inlet of the steam turbine, and/or a recirculation line (21) that connects an outlet of the steam turbine with a feed water inlet of the steam generator. A first circuit is formed for a first thermodynamic cycle. A first heat exchanger is switched on in the recirculation line at primary side and in a second circulation line at secondary side for a second thermodynamic cycle. A condensate pump is switched on in the recirculation line between the first heat exchanger and the steam generator. A second heat exchanger is switched on as evaporator for a desalination plant in the recirculation line between the steam turbine and the first heat exchanger. An additional steam turbine is switched on in the second circuit and is connected with a generator. The second thermodynamic cycle is an organic-Rankine-cycle or Kalina cycle. A line (27) for a process condensate flows a process steam disengaged from the steam line between the steam turbine and the first heat exchanger in the recirculation line. An independent claim is included for a method for operating a power plant.
机译:该发电厂包括蒸汽发生器(15),蒸汽涡轮机(18),将蒸汽发生器的蒸汽出口与蒸汽涡轮机的入口连接的蒸汽管(22)和/或再循环管线(21)。连接蒸汽轮机的出口和蒸汽发生器的给水入口。形成用于第一热力学循环的第一电路。在第二侧的第一热循环中,在第一侧的再循环管路中打开第二热交换器的第二热交换器循环中的第一热交换器。该发电厂包括蒸汽发生器(15),蒸汽涡轮机(18),将蒸汽发生器的蒸汽出口与蒸汽涡轮机的入口连接的蒸汽管(22)和/或再循环管线(21)。连接蒸汽轮机的出口和蒸汽发生器的给水入口。形成用于第一热力学循环的第一电路。在第二侧的第一热循环中,在第一侧的再循环管路中打开第二热交换器的第二热交换器循环中的第一热交换器。在第一热交换器和蒸汽发生器之间的再循环管路中打开冷凝水泵。在蒸汽轮机和第一热交换器之间的再循环管线中,第二热交换器作为用于脱盐设备的蒸发器被接通。另一台蒸汽涡轮机在第二回路中接通,并与发电机连接。第二热力学循环是有机朗肯循环或卡利纳循环。用于过程冷凝物的管线(27)使从蒸汽管线分离出的过程蒸汽在再循环管线中的蒸汽轮机和第一热交换器之间流动。包括用于运行电厂的方法的独立权利要求。

著录项

  • 公开/公告号DE102009013570A1

    专利类型

  • 公开/公告日2010-09-30

    原文格式PDF

  • 申请/专利权人 SIEMENS AKTIENGESELLSCHAFT;

    申请/专利号DE20091013570

  • 发明设计人 WANKA JELDRIK;

    申请日2009-03-17

  • 分类号F01K23/02;C02F1/10;

  • 国家 DE

  • 入库时间 2022-08-21 18:28:21

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号