首页> 外国专利> ASSEMBLY FOR FABRICATION OF COMPLETE SET FOR PIPELINE AND COMPLETE SET FOR PIPELINES FABRICATED WITH THIS ASSEMBLY

ASSEMBLY FOR FABRICATION OF COMPLETE SET FOR PIPELINE AND COMPLETE SET FOR PIPELINES FABRICATED WITH THIS ASSEMBLY

机译:用于装配管道的成套设备的装配以及装配有该装配的管道的成套设备

摘要

FIELD: machine building.;SUBSTANCE: according to invention assembly for fabrication of complete set of items for heat-hydro-insulated pipeline consists of process posts mounted on foundation, successively arranged and communicated between them; these posts form not less, than two process lines fabricating set of pipe-casings, pipe-work pieces for fittings: couplings, Z and "П"-shaped elements of pipelines, pipe diminishing pieces, branches, and also work pieces for couplings and for hydro-insulating multi-purpose accessories of pipelines within ranges from 700 to 1250 mm including partially shut-off internal range from 850 to 1050 mm. Also the assembly consists of the post for preparation of working pipes, for example metallic pipes, preferably, steel ones, of the post of assembling the structure pipe-in-pipe and of the post for pouring solidificated filling mixture. Mixture consists out of at least polyol component and isocyanate. At least one line additionally contains a system of start-up; while at least design of one line facilitates double corona electro-spark treatment. The complete set of items for the heat-hydro-insulated pipeline consists of heat-hydro-insulated pipes, of fittings including heat-hydro-insulated Z and "П"-shaped elements, of pipe diminishing pieces, of branches, for example T-joints, and also of heat-hydro-insulated shut-off accessories and couplings of hydro-insulation fabricated by means of the assembly. Each heat-hydro-insulated item is made with calculated density of a heat-insulating layer not less, than 60 kg/m3. Assembly of structures pipe-in pipe included to the complete set is performed not earlier, than in twenty four hours upon fabrication of hydro-insulation: pipe-casing or pipe-work piece for a fitting, of a work-piece for hydro-insulation for all purpose accessories.;EFFECT: design of integrated universal assembly uniting process posts facilitating integrated process for fabricating complete set of items for heat-hydro-insulated pipeline; increased process simplification and efficiency of items production for heat-hydro-insulated pipeline; maximal compactness; reduced heat losses.;25 cl, 17 dwg
机译:技术领域:根据本发明,用于制造用于热水绝缘管道的整套设备的组件包括:安装在基础上的工艺柱,它们之间相继布置并连通。这些柱构成不少于两条生产线,这些生产线制造了一组管道套管,用于配件的管道工件:接头,管道的Z型和“П”形元件,减径件,分支以及用于接头和连接件的工件用于700至1250 mm范围内的管道的多用途水绝缘,包括内部关闭的850至1050 mm范围。该组件还包括用于准备工作管的支柱,例如金属管,优选地为钢管;用于组装结构管中管的支柱;以及用于倾倒固化的填充混合物的支柱。混合物至少由多元醇组分和异氰酸酯组成。至少一行还包含一个启动系统;而至少一条生产线的设计有利于双电晕电火花处理。绝热管道的整套项目包括:绝热管​​道,配件(包括Z形和“П”形),管子减径件,分支(例如T)配件-接头,以及通过组件制造的水热绝缘截止附件和水绝缘接头。各绝热物品的绝热层的算出密度为60kg / m 3 。包括在整套设备中的结构入水管的组装,不得早于制造水绝缘后的二十四小时内进行:用于水绝缘的管壳或管件,用于水绝缘的工件效果:集成通用组装的联合工艺柱的设计,为集成工艺制造完整的热水绝缘管道项目提供了便利;进一步提高了热加氢隔热管道的工艺简化程度和生产效率;最大的紧密度;减少热损失。; 25 cl,17 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号