首页> 外国专利> METHOD FOR MANAGING A PROJECT BUDGET, PARTICULARLY FOR EFFICIENTLY RECOGNIZING A PROGRESSING RATE OF A COST TO PROJECT BUDGET

METHOD FOR MANAGING A PROJECT BUDGET, PARTICULARLY FOR EFFICIENTLY RECOGNIZING A PROGRESSING RATE OF A COST TO PROJECT BUDGET

机译:用于管理项目预算的方法,尤其是用于有效地识别项目预算成本的进度的方法

摘要

PURPOSE: A method for managing a project budget is provided to analyze a cost structure depending on each project type and minimize a distortion of progress rate depending on excess or deficiency.;CONSTITUTION: Types for the project items included in a project are determined(S10), and the budget rates for each project item is determined according to the types of the determined projects(S20). Based on the determined budget rates, the cost performance of the project is calculated(S30). Among the plural project items, the average of budget ratio of the project items of the identical type inputted in advance is determined as the budget rate of the corresponding project items.;COPYRIGHT KIPO 2010
机译:目的:提供一种用于管理项目预算的方法,以根据每种项目类型分析成本结构,并最大程度地减少因过剩或不足而造成的进度失真。;构成:确定项目中包括的项目项目的类型(S10) ),然后根据确定的项目的类型确定每个项目的预算率(S20)。基于确定的预算率,计算项目的成本绩效(S30)。在多个项目项目中,将预先输入的相同类型项目的预算比率的平均值确定为相应项目项目的预算比率。; COPYRIGHT KIPO 2010

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号