ONLINE TRANSFORMER ERECTION USING LOCAL AMENITIES (JCB)
ONLINE TRANSFORMER ERECTION USING LOCAL AMENITIES (JCB)
展开▼
机译:使用当地设施(JCB)进行在线变压器安装
展开▼
页面导航
摘要
著录项
相似文献
摘要
Electricity is generated, transmitted by EHT lines, step down in HT lines and distributed via Distribution Transformers. The Distribution Transformers are serially connected in HT feeders and distribute LT supply. Whenever replacement of Distribution Transformers work is carried out (any fault occurs in Distribution Transformers or any enhancement or lowering the capacity of Distribution Transformers) either entire supply of the HT feeder or major part of HT supply is interrupted with long duration of 3 to 4 hours. To eliminate this long duration 3 to 4 hrs into 30 minutes and to avoid the entire HT feeder supply interruption except the working place and a new method "ONLINE TRANSFORMER ERECTION USING LOCAL AMENITIES (JCB)" was invented.Since the JCBs are commonly available at many places for rental, at cheaper cost than Crane, more number of Distribution Transformers can be replaced.
展开▼