METHOD, DEVICE AND PROGRAM FOR EVALUATING POWER GENERATION COST, SYSTEM FOR SCHEDULING POWER GENERATION, AND SYSTEM FOR CONTROLLING START/STOP OF POWER GENERATION FACILITY
METHOD, DEVICE AND PROGRAM FOR EVALUATING POWER GENERATION COST, SYSTEM FOR SCHEDULING POWER GENERATION, AND SYSTEM FOR CONTROLLING START/STOP OF POWER GENERATION FACILITY
展开▼
机译:用于评估发电成本的方法,装置和程序,用于调度发电的系统以及用于控制发电设施的启动/停止的系统
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To provide a method for evaluating power generation cost while taking account of constraints between times (e.g., constraints of the output from a power generation facility or change in start/stop state) by taking account of relevance of demand distribution between times.;SOLUTION: In a method for evaluating power generation cost, a probability W that the demand pi+1 at time Ti+1 falls in the si+1-th division range R (Ti+1, si+1) is generated when the demand pi at time Ti falls in the si-th division range R (Ti, si), and then the expected value C0 of power generation cost C between the times T1 and TN is calculated using the probability W while taking account of all demand transition patterns between the times T1 and TN.;COPYRIGHT: (C)2010,JPO&INPIT
展开▼
机译:要解决的问题:提供一种评估发电成本的方法,同时考虑时间之间的约束(例如,发电设施输出的约束或启动/停止状态的变化),同时考虑之间的需求分配的相关性解决方案:在一种评估发电成本的方法中,时间t i + 1 Sub>上的需求p i + 1 Sub>落入s i i>时,会生成第> i + 1 Sub>个除法范围R(T i + 1 Sub>,s i + 1 Sub>)。 Sub>在时间T i Sub>落入第s i Sub>个划分范围R(T i Sub>,s i Sub> ),然后使用概率W来计算时间T 1 Sub>和T N Sub>之间的发电成本C的期望值C 0 Sub>考虑到时间T 1 Sub>和T N Sub>之间的所有需求转换模式。;版权:(C)2010,JPO&INPIT