首页>
外国专利>
First asphalt layer system and method of breakthrough.
First asphalt layer system and method of breakthrough.
展开▼
机译:率先突破沥青层体系和方法。
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method for the operation of a first asphalt layer system has, a plan for paving of a working area, the temperature model is based on a position. The method further has, for asphalt material temperature to receive and to compare the temperature data with data from the position temperature model have been predicted. The operation of the first asphalt layer system is adjusted, where the actual data from the predicted model data deviation. A first asphalt layer system and a control system are provided, which has an electronic control unit and is configured for the electronic data with a position to compare the temperature model for asphalt material. The electronic control unit, it is also possible to use machines of the first asphalt layer system based on the comparison of actual data with predicted model data control and can be further a plan for paving of a working area and / or the position temperature model based on the differences between the actual data and the predicted model data updating. A complete temperature profile of a road surface work region, including of a comparison with the model can, in the computer readable memory for nachforschungs - and previously say analysis be recorded.
展开▼