首页> 外国专利> METHOD TO REVEAL ACTUAL CONTRIBUTION OF ELECTRIC CIRCUIT LOADS INTO DISTORTION OF POWER QUALITY AT COMMON CONNECTION POINT

METHOD TO REVEAL ACTUAL CONTRIBUTION OF ELECTRIC CIRCUIT LOADS INTO DISTORTION OF POWER QUALITY AT COMMON CONNECTION POINT

机译:揭示电路负载的实际贡献以破坏公共连接点的电能质量的方法

摘要

FIELD: electrical engineering.;SUBSTANCE: proposed method comprises measuring actual contribution into distortion of power quality at common connection point via measuring voltage harmonic composition at the said point, current harmonic composition and phase shift angles between voltages and currents in each harmonic. Voltage of every harmonic in the said common connection point is decomposed into direct, incident onto electric circuit load input, and backward, reflected from aforesaid input, waves with due allowance for initial parametres of the load connection line. Quantitative estimation of contribution of the k-th load into distortion voltage is determined from actual voltage of backward. Voltage of every harmonic at the said common connection point is decomposed into components of direct and backward waves in T-conversion channel, while backward wave voltage is defined by inverse transformation of backward waves in channels. Distortion voltage at aforesaid point is determined in real-time by values of the voltage harmonic composition at every time moment and averaged for required time interval.;EFFECT: higher validity, simpler determination.;3 cl
机译:领域:所提出的方法包括通过测量在公共连接点处的电压谐波成分,电流谐波成分以及每个谐波中电压和电流之间的相移角来测量对公共连接点的电能质量失真的实际贡献。所述公共连接点中的每个谐波的电压被分解成直接波,入射到电路负载输入上,并且被反向反射,从前述输入上反射,从而为负载连接线的初始参数留出适当的余量。根据反向的实际电压确定第k个负载对失真电压的贡献的定量估计。在所述公共连接点处的每个谐波的电压被分解成T转换通道中的正向和反向波的分量,而反向波电压由通道中反向波的逆变换来定义。通过每个时刻的电压谐波成分值实时确定上述点的畸变电压,并平均所需的时间间隔。效果:有效性更高,确定更简单; 3 cl

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号