首页>
外国专利>
METHOD OF PREVENTING FROST HEAVE STRESS CONCENTRATIONS IN CHILLED BURIED PIPELINES
METHOD OF PREVENTING FROST HEAVE STRESS CONCENTRATIONS IN CHILLED BURIED PIPELINES
展开▼
机译:防止冷管中冻胀应力浓度的方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
A method for maintaining a stable soil by surrounding a chilled gas pipe with a material that has an antifreeze component that prevents the soil from freezing. By keeping the soil from freezing, it remains stable at all times. The method calls for excavating a trench, lining it with a geotextile membrane that keeps water from infiltrating into the trench, and then surrounding it with a bed of limestone (calcium carbonate) that is mixed with calcium magnesium acetate (CMA), which acts as an anti-freeze agent. The limestone-CMA mixture surrounds the pipe. The trench is covered by another geotextile membrane to completely seal it. In this way, the pipeline is surrounded by a material that is not subject to freezing. As such, it provides a stable bed for the pipeline to prevent frost heaving.
展开▼