首页>
外国专利>
Positioning methods trunk of directional and horizontal wells in the reservoir to assess the completeness of coverage of oil or oil and gas deposits DEVELOPMENT
Positioning methods trunk of directional and horizontal wells in the reservoir to assess the completeness of coverage of oil or oil and gas deposits DEVELOPMENT
展开▼
机译:储层定向井和水平井主干的定位方法,以评估油气或油气沉积物覆盖的完整性开发
展开▼
页面导航
摘要
著录项
相似文献
摘要
method u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 u043fu043eu043bu043eu0436u0435u043du0438u00a0 poles tilt and horizontal wells in the productive level, aimed to assess the completeness of u043du0435u0444u0442u00a0u043du043eu0439 or u043du0435u0444u0442u0435u0433u0430u0437u043eu0432 oh, deposits of the development by u043eu043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 spatial u043fu043eu043bu043eu0436u0435u043du0438u00a0 points u043fu0435u0440u0435u0441u0435u0447u0435u043du0438u00a0 productive reservoirs u043fu0440u043eu0431u0443u0440u0435u043du043du044bu043cu0438 operating tilt aims establishment or horizontal wells with vertical and horizontal error of not more thane 0.5 m, including the initiation of seismic (acoustic) waves, u043eu0431u0440u0430u0437u0443u044eu0449u0438u0445u0441u00a0 in perforation of productive reservoir at the wells or a special u0437u0430u0440u00a0u0434u0430 in fixed point, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 so that the perforations or explosion by u0437u0430u0440u00a0u0434u0430 register from the drill presses or u0437u0430u0440u00a0u0434u0430 seismic waves u0441u0435u0439u0441u043cu043eu043fu0440u0438u0435u043cu043du0438u043au0430u043cu0438,located at a distance of 2 km or more from the u0443u0441u0442u044cu00a0 at wells with spatial u043fu0440u0438u0432u00a0u0437u043au043eu0439 gps (accuracy of 5 cm) u0443u0441u0442u044cu00a0 wells and u0441u0435u0439u0441u043cu043eu043fu0440u0438u0435u043cu043du0438u043au043eu0432 and before the definition of speed u0432u0430u0440u0438u0442u0435u043bu044cu043du044bu043c u043fu0440u043eu0445u043eu0436u0434u0435u043du0438u00a0 seismic waves u0434u043bu00a0 type geological transect in perforation of productive reservoir in vertical scr u0430u0436u0438u043du0435 bushu043au043eu0442u043eu0440u0430u00a0 u0438u0441u043fu043eu043bu044cu0437u0443u044eu0442u0441u00a0 as u0431u0430u0437u043eu0432u0430u00a0 when processing the acquired seismic data u0434u043bu00a0 the u043cu0435u0441u0442u043eu0440u043eu0436u0434u0435u043du0438u00a0, which definitely u043eu043fu0440u0435u0434u0435u043bu00a0u0435u0442u0441u00a0 point of initiation of explosion u0430u0440u00a0u0434u043eu0432,located within the stratum in borehole and tilt to u043eu043fu0440u0435u0434u0435u043bu00a0u0435u0442u0441u00a0 line real u0440u0430u0441u043fu043eu043bu043eu0436u0435u043du0438u00a0 u0437u0430u0431u043eu0435u0432 tilt aimed wells project the design and development of u043eu0446u0435u043du0438u0432u0430u0435u0442u0441u00a0 coverage of deposits on the basis of the data obtained.
展开▼