首页> 外国专利> The expanding tunnel and constructing method of the existing tunnel which was constructed in rock masses

The expanding tunnel and constructing method of the existing tunnel which was constructed in rock masses

机译:岩体中既有隧道的扩建隧道及施工方法

摘要

The present invention relates to expand its technology and construction method of tunnel construction on existing ground conditions consisting of rock such, installing the housing at regular intervals in the lining of the existing tunnel, and drilling a step-by-step to a predetermined size of the unit by installing a ball drilling rigs equipped with a bucket on the auger housing and pouring concrete reinforcement after the reinforcement in the drilling hole After curing to form an extended tunnel excavation hole wall to remove the rock between the tunnel lining and expand existing tunnel hole tunnel walls is an extension to install. ; How will housing construction objection to a half of the total housing in the rock drilling length of the upper lining of the tunnel to the existing installation of the housing with a certain length and a certain distance of an existing tunnel lining and slowly entered the yuapjaek Steps to install; ; half of the entire length of the housing to install the drilling equipment is mounted on the upper auger dredges lining to protrude to the existing tunnel entrance, and step-by-step basis by drilling a hole expansion drilling tunnel Steps to install a blank wall; ; The steps for installing rebar in the assembly and construction unit excavation ball over the task of curing pouring concrete to form the extended wall extension tunnel hole tunnel wall ball; ; removing the excavation of rock between the tunnel lining and expand existing tunnel hole wall; ; the housing drilling equipment installed in the housing to move to the next drilling the method comprising the step of repeatedly to form an extended tunnel ball end wall construction of the extended tunnel using; And ; will clean the road surface in order to communicate the packaging and transportation of the tunnel construction is completed expansion of facilities by installing lights in the tunnel to allow access to the tunnel.
机译:本发明涉及扩展其在包括岩石在内的现有地面条件下进行隧道施工的技术和施工方法,将壳体以规则的间隔安装在现有隧道的衬砌中,并逐步钻探至预定的尺寸。通过在钻机壳体上安装配备有铲斗的球形钻机并在钻孔中加固后浇注混凝土钢筋,固化后形成扩展的隧道开挖孔壁,以去除隧道衬砌之间的岩石并扩大现有的隧道孔隧道墙是安装的扩展。 ;房屋建筑如何在隧道上部衬砌的凿岩长度中反对整个房屋的一半到具有一定长度和一定距离的现有隧道衬砌的现有房屋安装并缓慢进入yuapjaek步骤安装; ;安装钻探设备的整个壳体长度的一半安装在上螺旋钻挖泥机衬板上,以突出到现有的隧道入口,并通过在钻孔基础上逐步钻扩孔来安装空洞; ;在组装和施工单位的开挖球中安装钢筋的步骤,是为了完成浇筑混凝土的固化工作,以形成延伸壁的延伸隧道孔,隧道壁球; ;清除隧道衬砌之间的岩石开挖并扩大现有的隧道孔壁; ;所述壳体钻探设备安装在所述壳体中以移至下一个钻探,所述方法包括以下步骤:重复地使用所述延伸隧道形成延伸隧道的球端壁构造。和;将清洁路面以沟通隧道的包装和运输。通过在隧道内安装照明灯以允许进入隧道,完成设施的扩展。

著录项

  • 公开/公告号KR100548810B1

    专利类型

  • 公开/公告日2006-02-09

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20030018561

  • 发明设计人 최용기;박경욱;

    申请日2003-03-25

  • 分类号E21D9/01;

  • 国家 KR

  • 入库时间 2022-08-21 21:24:20

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号