首页> 外国专利> FABRICATED INCREMENTAL LAUNCHING TEMPORARY BRIDGE INSTALLED ON STEEL PIPE BENT USING STEEL PIPE BENT AND INCREMENTAL LAUNCHING GUIDE APPARATUS, AND CONSTRUCTION METHOD THEREOF

FABRICATED INCREMENTAL LAUNCHING TEMPORARY BRIDGE INSTALLED ON STEEL PIPE BENT USING STEEL PIPE BENT AND INCREMENTAL LAUNCHING GUIDE APPARATUS, AND CONSTRUCTION METHOD THEREOF

机译:使用钢管和增量发射引导装置在钢管上安装的增量式渐进式临时桥梁及其施工方法

摘要

The present invention can be temporarily passed by vehicles and passers-by when dismantling existing bridges over obstacles such as seas, rivers and valleys to install new bridges or when using existing bridges for maintenance of existing bridges. It relates to a method of installing temporary bridges to be installed.;Steel pipe column position maintaining device is installed so that a pair of steel pipe pillars can be installed on both sides of the bridge where the bridge is to be installed and the steel pipe column vents that can support the bridge structure on the bridge installed on one side can be installed at both sides. After installation, the steel pipe pile penetrates the steel pipe pile formed in the steel pipe column position maintaining device, and then the steel pipe pile is installed by using a driving machine to install a steel pipe pillar vent, and then the steel pipe cap installed in the extrusion guide device on the steel pipe pillar vent. Install an extrusion guide device by covering the extruder, install an extrusion device on the shift, and contact the mold, which is the cross-linked upper structure, with one end of the extrusion hydraulic jack installed in the extrusion device, and then exert the extrusion force on the extrusion hydraulic jack. The extrusion guide device while extruding the mold, which is a cross-linked upper structure, in the pressure direction The lower portion of the mold forming the cross-linked upper structure is placed into the guide installed in pairs at regular intervals installed at the upper portion, and the cross-linked upper structure extruded from the extruder is advanced to be installed on the sliding rod installed in the guide. As the steel pipe pillar vent is installed while advancing, the extrusion guide device is installed thereon, and the cross-linked superstructure is connected to the installation of the first cross-linked superstructure, and then extruded again into the extrusion apparatus. To complete the designed bridge width and length to complete the installation of extrusion prefabricated bridge of the designed specifications.;In order to prevent the tip portion of the cross-linked superstructure from sagging when the cross-linked superstructure is extruded and advanced between the steel pipe pillar vents, a tip support and a turning device are installed to cran in or support the tip of the cross-linked superstructure. Extrusion guide device installed on the steel pipe pillar vent when the cross-linked superstructure moves forward by installing the propulsion nose at the tip and connecting the tip and the prop nose to the reversing hydraulic jack while preventing the tip part from sagging by the wire rope connected to the device. Steel pipe column position maintaining device to be able to adjust the direction to be advanced between a pair of guides, and to maintain a constant distance from the steel pipe pile and the correct position when the steel pipe pile is type in the ground using the driving Install it, and also the steel pipe pile Laser reception target attaches a laser transmitter to the top of the cross-linked superstructure in order to ensure that the correct position and steel pipe piles are exactly vertical when typed into the furnace, and receives a laser beam emitted from the transmitter. It is to be installed in the steel pipe cap of the steel pipe column position maintaining device to maintain the exact position and vertical when the steel pipe pile in the ground.
机译:当在诸如海洋,河流和山谷的障碍物上拆除现有的桥梁以安装新的桥梁时或者当使用现有的桥梁来维护现有的桥梁时,本发明可以由车辆和过路人临时通过。本发明涉及一种要安装的临时桥梁的安装方法。安装钢管柱位置保持装置,以便在将要安装桥梁的桥梁和钢管的两侧安装一对钢管柱。在一侧安装的桥上可以支撑桥结构的立柱通风孔可以安装在两侧。安装完成后,将钢管桩穿入钢管立柱位置保持装置中形成的钢管桩,然后用打入机安装钢管桩,安装钢管立柱通风口,然后安装钢管盖在钢管立柱排气口上的挤压导向装置中。覆盖挤出机,安装挤出导向装置,在移位机上安装挤出装置,并与模具相接触,该模具是交联的上部结构,挤出液压千斤顶的一端安装在挤出装置中,然后施加压力。挤压液压千斤顶上的挤压力。挤压引导装置在沿压力方向挤压作为交联的上部结构的模具的同时,将形成交联的上部结构的模具的下部以规则的间隔成对安装在安装在上部的引导器中。从挤出机挤出的交联的上部结构前进,以安装在安装在导向装置中的滑杆上。由于在前进时安装钢管立柱排气口,因此在其上安装有挤压引导装置,并且将交联的上部结构连接到第一交联的上部结构的安装,然后再次挤压到挤压装置中。完成设计桥的宽度和长度以完成设计规格的挤出预制桥的安装。;为了防止在钢之间挤压和推进交联上部结构时,交联上部结构的尖端部分下垂。安装了管柱通风口,顶部支撑和转向装置,以在交联的上部结构的顶部倾斜或支撑。当交联的上层建筑向前移动时,通过在尖端安装推进鼻并将尖端与支撑鼻连接到可逆液压千斤顶,同时防止尖端部分被钢丝绳下垂,从而在钢管立柱通风口处安装挤出导向装置连接到设备。钢管柱位置保持装置,其能够调整一对引导件之间的行进方向,并且在利用驱动力将钢管桩打入地面时能够保持与钢管桩的恒定距离和正确位置。安装它,然后将钢管桩激光接收目标将激光发射器连接到交联的上部结构的顶部,以确保正确的位置,并且在输入炉子时钢管桩精确地垂直,并接收激光发射器发射的光束。它应安装在钢管立柱位置保持装置的钢管帽中,以在钢管桩在地下时保持准确的位置和垂直。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号