首页> 外国专利> Process for managing the current-surge that occurs when electric service is restored, following a power outage

Process for managing the current-surge that occurs when electric service is restored, following a power outage

机译:停电后恢复电力服务时发生的电流浪涌的管理过程

摘要

A process for managing the current-surge that occurs when electric service is restored, following a power outage. In the initial embodiment, the device takes the form of a kit of, typically, six modules (Figure Two). The user inserts a module between the power plug of the appliance and the wall outlet. The modules insert a time-delay between the arrival of electric power at the wall, and delivery of that power to the affected appliance. The user selects from a choice of delays ranging from ten seconds to 100 seconds, in ten-second steps. Thus, the startups of affected appliances are sequenced such that the current-surges are distributed over ten-second intervals. No two or more delays should be the same, and simultaneous startups leading to combined current-surges are avoided, leading to aforementioned benefits.
机译:一种用于管理停电后恢复电力服务时发生的电涌的过程。在最初的实施例中,该设备采取通常由六个模块组成的套件的形式(图二)。用户将模块插入设备的电源插头和壁装电源插座之间。这些模块在电能到达墙壁和将该电能传输到受影响的设备之间插入了一个延时。用户可以选择十秒到100秒之间的延迟,以十秒为单位。因此,对受影响的设备的启动进行排序,以使电涌在十秒的间隔内分布。没有两个或两个以上的延迟应该是相同的,并且避免了同时启动会导致电流浪涌的组合,从而带来了上述好处。

著录项

  • 公开/公告号US2006245134A1

    专利类型

  • 公开/公告日2006-11-02

    原文格式PDF

  • 申请/专利权人 MAX ALEXANDER GRATZL;

    申请/专利号US20050271761

  • 发明设计人 MAX ALEXANDER GRATZL;

    申请日2005-11-10

  • 分类号H02H9/02;

  • 国家 US

  • 入库时间 2022-08-21 21:46:03

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号