SLURRY TREATING FACILITY OF SLURRY SHIELD CONSTRUCTION METHOD AND SHIELDING TUNNEL CONSTRUCTION METHOD

机译:泥浆盾构施工方法及泥土隧道施工方法的泥浆处理设施

摘要

PROBLEM TO BE SOLVED: To improve transport efficiency of slurry; and to simplify a slurry transport facility, by straightly treating slurry in the rear vicinity of a shield machine, by minimizing various facilities including a pipe for slurry treatment of a slurry shield construction method.;SOLUTION: This slurry shield construction method excavates by the shield machine 1 in a state of filling the slurry in a cutting face of a tunnel; and comprises carriages 6, 7 and 8 arranged in the rear vicinity of the shield machine 1, and a slurry treating plant 10 mounted on these carriages 6, 7 and 8 and treating the slurry discharged together with excavation earth from the shield machine 1 by supplying the slurry to the shield machine 1. Since the slurry treating plant 10 is mounted on the carriages 6, 7 and 8 towed to the rear vicinity of the shield machine 1, the various facilities including the pipe for the slurry treatment is preferably minimized by only extending to the rear vicinity of the sheild machine 1. Since the slurry can be immediately treated in the rear vicinity of the shield machine 1, slurry transport efficiency is improved. The slurry transport facility can also be simplified.;COPYRIGHT: (C)2006,JPO&NCIPI
机译:要解决的问题:提高泥浆的输送效率;并通过以下方式简化泥浆输送设备:在盾构机的后部直接处理泥浆,并通过减少各种设施(包括用于泥浆盾构施工方法的泥浆处理的管道)来解决该问题。在将浆料填充到隧道的切割面上的状态下的机器1。并包括布置在屏蔽机1的后部附近的滑架6、7和8,以及安装在这些滑架6、7和8上的泥浆处理设备10,该泥浆处理设备10通过与供应一起处理从屏蔽机1一起排出的泥浆与挖掘土一起进行处理由于将泥浆处理设备10安装在拖曳到屏蔽机1后部附近的托架6、7和8上,因此,包括泥浆处理的管道在内的各种设备优选地仅通过使泥浆处理设备最小化而被最小化。泥浆可以延伸到开卷机1的后部附近。由于可以在屏蔽机1的后部附近立即处理泥浆,因此可以提高泥浆的输送效率。浆液运输设备也可以简化。;版权所有:(C)2006,JPO&NCIPI

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号