首页> 外国专利> A way of redistributing water between catchments fill aquifers and increase in reservoir capacity of water reserves

A way of redistributing water between catchments fill aquifers and increase in reservoir capacity of water reserves

机译:在集水区含水层之间重新分配水和增加水库蓄水量的一种方法

摘要

1.method u043fu0435u0440u0435u0440u0430u0441u043fu0440u0435u0434u0435u043bu0435u043du0438u00a0 water, u0437u0430u043au043bu044eu0447u0430u044eu0449u0438u0439u0441u00a0 is, by u043fu0435u0440u0435u043au0440u044bu0442u0438u00a0 natural watercourse in the overpressure reservoir catchment are in this place, h he has a hydraulic u0441u0432u00a0u0437u044c with insufficient watershed through the at least one aquifer, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 what place u0441u043eu0437u0434u0430u043du0438u00a0 uca drop basin u00a0u0432u043bu00a0u0435u0442u0441u00a0 place u0432u0441u043au0440u044bu0442u0438u00a0 watercourse at leastone u0432u043eu0434u043eu0443u043fu043eu0440u0430.;2. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the or each of the u0432u043eu0434u043eu0443u043fu043eu0440u043eu0432 u00a0u0432u043bu00a0u0435u0442u0441u00a0 u0432u043eu0434u043eu0443u043fu043eu0440u043du044bu043c ground aquifer.;3. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the or one of the u0432u043eu0434u043eu0443u043fu043eu0440u043eu0432 u00a0u0432u043bu00a0u0435u0442u0441u00a0 multi-year u043cu0435u0440u0437u043bu043eu0442u043eu0439.;4. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the water flows and the establishment of u043eu0441u0443u0449u0435u0441u0442u0432u043bu00a0u044eu0442 seas through the construction of dams on the river.;5. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the water flows and a pond u043eu0441u0443u0449u0435u0441u0442u0432u043bu00a0u044eu0442 through the construction of a dam u0434u043bu00a0 run-off collection of several small rivers and / or streams.;6. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the water level in a reservoir with higher water u0443u0440u043eu0432u043du00a0 lack u0434u043bu00a0 u043du0430u0441u044bu0449u0435u043du0438u00a0 catchment water, at least one water u043du043eu0441u043du043eu0433u043e horizon and u0434u0440u0435u043du0438u0440u043eu0432u0430u043du0438u00a0 water from the pond in the lack of the reservoir.;7. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the water level in the reservoir are below u0443u0440u043eu0432u043du00a0 water results in u0434u043bu00a0 u043eu0433u0440u0430u043du0438u0447u0435u043du0438u00a0 catchment discharge aquifers in over the reservoir.;8. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that create additional pond or cascade hydraulic u0441u0432u00a0u0437u0430u043du043du044bu0445 water results in a u0433u0438u0434u0440u043eu0430u0433u0440u0435u0433u0430 catchment in the u0434u043bu00a0 electricity.;9. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the u043eu0441u0443u0449u0435u0441u0442u0432u043bu00a0u044eu0442 water from bodies of water and / or excessive watershed and / or additional pond u0434u043bu00a0 u0432u043eu0434u043eu0441u043du0430u0431u0436u0435u043du0438u00a0 territory approaching the watershed and / or u043fu0438u0442u0430u043du0438u00a0 intermediate gathering seas, which are on the upper stretch of the watershed and a water after ho u0437u00a0u0439u0441u0442u0432u0435u043du043du043eu0433u043e u0438u0441u043fu043eu043bu044cu0437u043eu0432u0430u043du0438u00a0 in lack of aquilegia.;10. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 p.9, so that, in the presence of a u0432u043eu0434u043eu0443u043fu043eu0440u0430 over an aquifer in the lack u0434u043bu00a0 catchment water use u043du0430u043fu043eu0440u043du0443u044e water.;11. way on any of the u043fu043f.8 and 9, u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0, energy, water, u043du0430u0445u043eu0434u00a0u0449u0435u0439u0441u00a0 additional reservoir or cascade of water use u0434u043bu00a0 u043fu0438u0442u0430u043du0438u00a0 drive special the main vehicle u0433u0438u0434u0440u043eu0444u0443u043du0438u043au0443u043bu0435u0440u0430.;12. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 1, so that the u043fu043eu043fu043eu043bu043du00a0u044eu0442 water underground reservoir, limited u0432u043eu0434u043eu0443u043fu043eu0440u043du044bu043cu0438 geological u0441u043bu043eu00a0u043cu0438, through the construction of the dam in place u0432u0441u043au0440u044b u0442u0438u00a0 u0432u043eu0434u043eu0443u043fu043eu0440u043du043eu0433u043e u043eu0441u043du043eu0432u0430u043du0438u00a0 reservoir.;13. method for u043eu0442u043bu0438u0447u0430u044eu0449u0438u0439u0441u00a0 p.12, however, that in the case of u043fu043eu043fu043eu043bu043du00a0u0435u043cu043eu043c aquifer or oil reservoir u043cu0435u0441u0442u043eu0440u043eu0436u0434u0435u043du0438u00a0 and / or strip him of the u043eu0441u0443u0449u0435u0441u0442u0432u043bu00a0u044eu0442 with u0435u0441u043fu0435u0447u0435u043du0438u0435u043c u0443u043bu0443u0447u0448u0435u043du0438u00a0 u0432u043eu0434u043eu043du0430u043fu043eu0440u043du044bu0445 conditions for their production.
机译:1.方法 u043f u0435 u0440 u0435 u0440 u0430 u0441 u043f u0440 u0435 u0434 u0435 u043b u0435 u043d u043d u0438 u00a0水, u0437 u0430 u043a u043b u044e u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0位于 u043f u0435 u0440 u0435 u043a u0440 u044b u0442 u0438 u00a0位于超压水库集水区的天然水道中, h他有一个液压 u0441 u0432 u00a0 u0437 u044c,并且至少有一个分水岭通过至少一个含水层, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u0441 u00a0放置 u0441 u043e u0437 u0434 u0430 u043d u0438 u00a0 uca落水盆 u00a0 u0432 u043b u00a0 u0435 u0442 u0441 u00a0放置 u0432 u0441 u043a u0440 u044b u0438 u00a0水道至少一个 u0432 u043e u0434 u043e u0443 u043f u043e u0440 u0430 .; 2。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,因此 u0432 u043e u0434 u043e u043e u0443 u043f u043e u0440 u043e u0432 u00a0 u0432 u043b u00a0 u0435 u0432 u0442 u0441 u00a0 u0432 u043e u0434 u043e u043e u0443 u043f u043e u043e u0440 u043d u044b u043c是地面含水层。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,因此 u0432 u043e u0434 u043e u043e u0443 u043f u043e u0440 u043e u0432 u00a0 u0432 u043b u00a0 u0435 u0442 u0441 u00a0多年 u043c u0435 u0440 u0437 u043b u043e u0442 u0432 u043e u0439.u4。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,以便水流动并建立 u043e u0441 u0443 u0449 u0435 u0441 通过在河上修建水坝使海面泛滥; 5。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,使水流成池塘 u043e u0441 u0443 u0449 u0449 u0435 u0441 u0442通过修建几条小河和/或小溪的径流汇水坝,修建大坝。6。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,使水位较高的水库中的水位 u0443 u0440 u04340 u043e u0432 u043d u00a0缺少 u0434 u043b u00a0 u043d u0430 u0441 u044b u0449 u0435 u043d u0438 u00a0集水量,至少一种水 u043d u043e u0441 u0441 u043d u043e u0433 u043e在没有水库的情况下从池塘里取水。7. 7.在没有水库的情况下,从池塘里取水。7.。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,从而水库中的水位低于 u0443 u0440 u043e u043e u0432 u043d u00a0水会导致水库上方的集水排泄含水层进入 u0434 u043b u00a0 u043e u0433 u0440 u0430 u043d u0438 u0447 u0435 u043d u043d u00a0; 8。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,以便创建其他池塘或级联液压 u0441 u0432 u00a0 u0437 u0430 u043d u043d u044b u0445水在 u0434 u043b u00a0电力中产生 u0433 u0438 u0434 u0440 u043e u0430 u0433 u0440 u0435 u0433 u0430集水区; 9。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,因此 u043e u0441 u0443 u0449 u0435 u0435 u0441 u0442 u0432 u043b u043b u00a0 u044e u0442来自水体和/或过多的流域和/或其他池塘的水 u0434 u043b u00a0 u0432 u043e u0434 u043e u0441 u043d u0430 u0431 u0431 u0436 u0435 u043d u0438 u00a0领土接近分水岭,并且 /或 u043f u0438 u0442 u0430 u043d u0438 u00a0处于中间集水海域,位于分水岭的上段,并在水流之后 u0437 u00a0 u0439 u0441 u0442 u0432 u0435 u043d u043d u043e u0433 u043e u0438 u0441 u043f u043e u043b u043b u044c u0437 u043e u0432 u0430 u043d u043d u0438 u00a0缺少aquilegia。 10。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 p.9的方法,这样,在存在 u0432 u043e u0434 u0434 u043e u0443 u043f u043e u0440 u0430在缺乏 u0434 u043b u00a0流域水的情况下,使用 u043d u0430 u043f u043e u0440 u043d u0443 u044e水; 11。 u043f u043f.8和9中的任何一个, u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0,能量,水, u043d u0430 u0445 u043e u0434 u00a0 u0449 u0435 u0439 u0441 u00a0使用其他水库或水流 u0434 u043b u00a0 u043f u0438 u0442 u0430 u043d u0438 u00a0驾驶专用主车 u0433 u0438 u0434 u0440 u043e u0444 u0443 u043d u0438 u043a u0443 u043b u0435 u0440 u0430。; 12。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 1的方法,因此 u043f u043e u043f u043e u043b u043d u043d u00a0 u044e u0442地下水库,有限 u0432 u043e u0434 u043e u0443 u043f u043e u0440 u043d u044b u043c u0438地质 u0441 u043b u043e u00a0 u043c u0438,通过在适当位置建造大坝 u0432 u0441 u043a u0440 u044b u0442 u0438 u00a0 u0432 u043e u0434 u043e u0443 u043f u043e u0440 u043d u043d u043e u0433 u043e u043e u0441 u043d u043e u0432 u0430 u043d u0438 u00a0存储库。; 13。 u043e u0442 u043b u0438 u0447 u0430 u044e u0449 u0438 u0439 u0441 u00a0 p.12的方法,但是,对于 u043f u043e u043f u043f u043e u043e u043b u043d u00a0 u0435 u043c u043e u043c含水层或储油层 u043c u0435 u0441 u0442 u043e u0440 u043e u0436 u0434 u0435 u043d u0438 u00a0并//或剥去 u043e u0441 u0443 u0449 u0435 u0441 u0442 u0432 u043b u00a0 u044e u0442与 u0435 u0441 u043f u0435 u0447 u0435 u043d u0438 u0435 u043c u0443 u043b u043b u044 u0448 u0435 u043d u0438 u00a0 u0432 u043e u0434 u043e u043d u0430 u043f u043e u0440 u043d u044b u0445其生产条件。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号