首页> 外国专利> Devices for Improving Load-Carrying Capacity of Reinforced Concrete Structures by Jacking Up, Anchoring High-strength and High-toughness Reinforced Panel, and Monitoring Deformations

Devices for Improving Load-Carrying Capacity of Reinforced Concrete Structures by Jacking Up, Anchoring High-strength and High-toughness Reinforced Panel, and Monitoring Deformations

机译:通过顶起,锚固高强度和高韧性钢筋面板以及监测变形来提高钢筋混凝土结构的承载能力的装置

摘要

Long-term or short-term material deterioration factors and structural safety obstacles occurring in the course of the public in the reinforced concrete structure and the current passing through the load (for example: DB-24) design load short of the (for example: DB-18 or less) to which a bridge or design load a method utilizing a variety of reinforcing materials such as steel sheets and steel wire, carbon fiber sheet, the fiber-reinforced epoxy panel is applied to improve the performance of the bridge that is evaluated as having the following common load carrying capacity.; Improvement device according to the present invention reinforced high strength, state reinforcement for concrete structures high toughness reinforcement plate (High-strength and High-toughness Reinforced Panel) of the directly upward soteum of the central portion of the structure by the pulling apparatus according to yuapjaek then to that fixed by the fixing method is not a simple mounting method in designing the thickness and the design width, and opposite ends of said main reinforcements to the design gap and the central portion occurs conventional compression upon introduction rises volume, including the attachment over the entire length of the structure before step reinforced this by measuring the negative moment strain of the tensile reinforcement of if there is a central portion compressed reinforced with continuous section of the structure which is to bear the tensile stresses, as well as comparisons with reinforced allowable stress construction the rises change in volume of the structure spans the central portion introducing a measuring means over a consists in, which method comprises. Is the measured actual residual strain after reinforced by rises volume introduced as the primary reinforcement of the high-strength and high parallelism are measured at the time of fixing the toughness reinforcing plate of the present design enables the assessment of the rapid performance improvements, and the thickness compared to the beams so of cracks due only do a small thin plate high strength, high toughness reinforcement plate for use by do not interfere with the foot below the area of ​​the cross river crossing reduction in plan flood level which is the factor of overflow of not caused as to rises volume forming closure and tensile by employing a wide range of main reinforcement in the portion up to the front end positive and enhances the load carrying capacity of the negative moment interval.
机译:在公共过程中,钢筋混凝土结构中的长期或短期材料劣化因素和结构安全障碍以及通过负载的电流(例如:DB-24)的设计载荷不足(例如: DB-18或以下),桥梁或设计要加载的方法是利用钢板和钢丝,碳纤维板等多种增强材料的方法,而纤维增强环氧板则用于改善桥梁的性能,即被评估为具有以下共同的承载能力。根据本发明的改进装置通过根据yuapjaek的牵拉装置对结构的中央部分的直接向上的骨质的高强度,状态增强的混凝土结构的高韧性增强板(高强度和高韧性增强板)进行了增强。那么,在设计厚度和设计宽度时,通过固定方法固定的方法不是简单的安装方法,并且所述主增强件的相对端部到设计间隙和中心部分在引入时会发生常规压缩,从而增加了体积,包括通过测量抗拉钢筋的负弯矩应变来确定钢筋在步骤加固之前的整个长度,该负向应变是:如果有一个中央部分被结构的连续截面压缩而承受拉应力,并与允许的钢筋进行比较压力建设上升的体积变化该结构跨越中心部分,在其中包含测量装置,该测量包括。在固定本设计的韧性补强板时,是否测量了作为高强度和高平行度的主要补强物而引入的因增加体积而补强后测得的实际残余应变,从而可以评估性能的快速提高,并且与横梁的厚度相比,这样的裂缝只造成了一块小的薄板高强度,高韧性的加固板使用而不会干扰脚下跨河越过平面洪水位降低的面积,这是因素通过在直至正极正端的部分中采用大范围的主加强筋,不会导致体积增大,从而形成封闭和拉伸,并增加了负力矩区间的承载能力。

著录项

  • 公开/公告号KR200369580Y1

    专利类型

  • 公开/公告日2004-12-09

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR20030040010U

  • 发明设计人 손영현;

    申请日2003-12-24

  • 分类号E01D22/00;

  • 国家 KR

  • 入库时间 2022-08-21 22:06:07

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号