首页> 外国专利> Marshalling yard function model on the basis of an operation sequence of modeling

Marshalling yard function model on the basis of an operation sequence of modeling

机译:基于建模操作序列的编组码功能模型

摘要

A method for managing railcar movement in a railyard based on the flow of railyard tasks, using a system that includes a computer including a processor, a memory device, and a database. The railyard includes six subyards including a surge yard, a receiving yard, a receiving inspected (RI) yard, a classification yard, a departure yard and a departure inspected (DI) yard. The method uses initial parameters, input to the computer, to simulate railyard task flow utilizing a yard performance model. Based on the simulation, the method determines if a train schedule can be met.
机译:一种用于基于铁路车站任务的流程来管理铁路车站铁路车辆运动的方法,其使用的系统包括计算机,该计算机包括处理器,存储设备和数据库。铁路场包括六个子场,包括调车场,接收场,接收检查(RI)场,分类场,离场和离场(DI)场。该方法使用输入到计算机的初始参数来利用堆场性能模型来模拟铁路堆场任务流程。基于模拟,该方法确定是否可以满足火车时刻表。

著录项

  • 公开/公告号DE10085366T1

    专利类型

  • 公开/公告日2002-12-05

    原文格式PDF

  • 申请/专利权人 GE-HARRIS RAILWAY ELECTRONICS L.L.C. MELBOURNE;

    申请/专利号DE2000185366T

  • 发明设计人 DONER JOHN R.;

    申请日2000-12-28

  • 分类号B61L27/00;G06F17/60;

  • 国家 DE

  • 入库时间 2022-08-21 23:43:08

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号