首页>
外国专利>
CONSTRUCTION MENAGEMENT SYSTEM AND CONSTRUCTION MANAGMENT METHOD OF STRUCTURE OF PRETRESSED COMPOSITE BEAM
CONSTRUCTION MENAGEMENT SYSTEM AND CONSTRUCTION MANAGMENT METHOD OF STRUCTURE OF PRETRESSED COMPOSITE BEAM
展开▼
机译:预应力复合梁结构施工管理系统及施工管理方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE: A construction management system and method of a prestress complex beam structure are provided to make a constructed procedure thereof exactly correspond to a design in an optimal condition. CONSTITUTION: In the construction management method of a prestress complex beam structure, firstly, a construction procedure of a prestress complex beam is divided into several steps for manipulating a prestress force, and an amount of manipulation per each step and an amount of variation are measured. A final structure is predicted per each construction step through an analysis of a structure obtained according to the instructions of a menu or information provided from database or key input information, and an error per each step is able to be determined through a comparative analysis of the structure and a design. Thereby, it is possible to minimize the determined error by adjusting the amount of manipulation to make the structure optimally correspond to the design.
展开▼