首页> 外国专利> The construction equipment for minimizing the number of operation holes developed during the construction of the Bridge with Movable Scaffolding System

The construction equipment for minimizing the number of operation holes developed during the construction of the Bridge with Movable Scaffolding System

机译:可移动脚手架系统桥梁施工期间减少施工孔数量的施工设备

摘要

PURPOSE: The minimization system of holes on a pier and an upper slab when constructing a bridge by a movable scaffolding system is provided to improve constructability and to improve the quality on a structure. CONSTITUTION: The minimization system of holes on a pier and an upper slab when constructing a bridge by a movable scaffolding system is to execute a superstructure work without a pier fitter for placing equipment on a pier and an upper slab, a rear cross beam fitter for supporting the backside, and a steel bar fitter for placing a form, through the steps of moving the entire equipment down to strip an outer form and an inner form after placing concrete, removing a strut, a turn buckle, a pin, etc. to dismantle the outer form, moving/stripping the outer form and stripping a slab of the inner form by a hydraulic jack, removing a steel bar fixed on a floor from and moving the whole of the floor form down by using a hydraulic jack attached to a suspension beam to be ready for moving a movable scaffolding system.
机译:目的:提供一种在通过可移动脚手架系统建造桥梁时,在桥墩和上部平板上的孔的最小化系统,以提高可施工性并提高结构质量。组成:在通过活动式脚手架系统建造桥梁时,桥墩和上台阶上的孔的最小化系统是在没有用于将设备放置在桥墩和上台阶上的桥墩钳工的情况下执行上部结构工作,通过在放置混凝土后向下移动整个设备以剥离外部模板和内部模板,移除支柱,转弯扣,大头钉等步骤来支撑背面和用于放置模板的钢筋钳工拆除外部模板,通过液压千斤顶移动/剥离外部模板并剥离内部模板的平板,使用固定在地板上的液压千斤顶从中移除固定在地板上的钢筋,并将整个地板向下移动悬挂梁准备移动可移动的脚手架系统。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号