Construction method for dikes with chambers, built from conventional concrete bars in U-profiles on vertical supports and filled with watery concrete

机译:带有堤防的堤防施工方法,该堤防由传统的U形混凝土钢筋在垂直支撑上制成,并填充水性混凝土

摘要

Dike has chambers, filled with water concrete and constructed from longitudinal and cross walls of conventional horizontal concrete bars (6) in U-profiles (2) on vertical supports (1). Supports are screwed into ground using lost threaded post-hole diggers. To construct sea-sided dam, triangular concrete sections are fastened to supports on water side. Sections have U-profile, into which concrete bars are fitted in layers. Each support has metal digger element with threaded sections, and other sections of cast concrete.
机译:堤防室中装有水混凝土,由垂直水平支撑(1)上U型(2)中常规水平混凝土钢筋(6)的纵向和横向壁构成。使用丢失的带螺纹的孔后挖土机将支架拧入地面。为了建造海滨大坝,将三角形混凝土部分固定在水侧的支撑上。型材的截面呈U形,混凝土条分层安装。每个支架都有金属挖掘器元件,该元件带有螺纹部分,而其他部分则为浇铸混凝土。

著录项

  • 公开/公告号DE10042924A1

    专利类型

  • 公开/公告日2002-03-21

    原文格式PDF

  • 申请/专利权人 HEITZ CHRISTOPH;

    申请/专利号DE20001042924

  • 发明设计人 HEITZ CHRISTOPH;

    申请日2000-09-13

  • 分类号E02B3/10;

  • 国家 DE

  • 入库时间 2022-08-22 00:27:29