Construction method for dikes with chambers, built from conventional concrete bars in U-profiles on vertical supports and filled with watery concrete
Construction method for dikes with chambers, built from conventional concrete bars in U-profiles on vertical supports and filled with watery concrete
展开▼
机译:带有堤防的堤防施工方法,该堤防由传统的U形混凝土钢筋在垂直支撑上制成,并填充水性混凝土
展开▼
页面导航
摘要
著录项
相似文献
摘要
Dike has chambers, filled with water concrete and constructed from longitudinal and cross walls of conventional horizontal concrete bars (6) in U-profiles (2) on vertical supports (1). Supports are screwed into ground using lost threaded post-hole diggers. To construct sea-sided dam, triangular concrete sections are fastened to supports on water side. Sections have U-profile, into which concrete bars are fitted in layers. Each support has metal digger element with threaded sections, and other sections of cast concrete.