System foam for forming the small vertical structure of the perforated wall and the method of constructing the perforated wall of the small vertical structure
System foam for forming the small vertical structure of the perforated wall and the method of constructing the perforated wall of the small vertical structure
展开▼
机译:用于形成多孔壁小竖向结构的系统泡沫及其构造方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a system for forming a multi-perforated wall of a small vertical structure configured to perform a step of forming a perforated wall step by step while slidingly moving a molding frame in sections in an excavated small vertical structure, and a method of constructing a small vertical structure using the same. As a technical feature of the present invention; Forming mold 10 assembled to form a molding surface as a size and shape for forming the perforated wall 1 on the inner circumferential surface of the small vertical structure excavated in the ground, and vertically along the inner circumference of the mold 10 In the configuration as a fixed frame 20 having vertical braces 21 to stand and support the molding frame 10, a predetermined interval between the vertical braces 21 on the inner surface of the molding frame 10 at regular intervals A plurality of yokes 30 are installed using a pair of fixing members 31 vertically arranged to face each other, and the jack rods 40 are vertically penetrated at the lower ends of the yokes 30, respectively, so that the upper and lower sides are vertically penetrated. The operation jacks 50 coupled to each other are installed to be operated, and are separated from the mold 10 so as to be positioned directly under the jack rods 40 so as to be installed on the preformed end of the perforated wall 1. Formed plurality of brackets 60 It is provided with, the jack rods 40 supported by the brackets 60 are supported in cooperation with the operation jacks 50 for forming the perforated wall of the small vertical structure to move the mold 10 up by section System foam,;The mold 10 and the bracket 60 are fixed to the upper part of the perforated wall 1 preformed from the bottom of the foundation in the excavated small vertical structure, and the mold 10 is placed in the corresponding working position. The uncured concrete is poured into the upper part of the preformed perforated wall 1 through the mold 10 placed therein, and the end of the perforated wall 1 is molded in series, and the molded part is molded from the formed end of the perforated wall 1. After releasing the mold 10, the actuating jacks 50, which cooperate with the jack rods 40 supported as the brackets 60, are operated to slid and move the mold 10 slowly and completely hardened. After placing the mold 10 on the upper end of the one end of the perforated wall 1 and placing it thereon, the brackets 60 which are attached to the preformed vented wall 1 are removed and simultaneously moved to remove the bracket 60. 1) and the molding die 10 placed in the next working position Clothing gongbyeok of the formed one by (1) the construction of the suit. Gongbyeok method hayeoseo placing the uncured concrete in the upper small Constructed hayeoseo perform the operation process for forming a next gongbyeok suit (1) of repeatedly vertical constructions.
展开▼