首页> 外国专利> Construction for combined hydroelectric power generation and water treatment consists of sheet steel construction

Construction for combined hydroelectric power generation and water treatment consists of sheet steel construction

机译:水力发电和水处理联合工程由钢板结构组成

摘要

Water from a water course is guided without damming-up through a water chamber. This consists of one or more intake chambers (2,5), which are screwed on an in-situ concrete base (1). A fish protection rake (4) is held liftable in a central carrier (6). The horizontal hollow bars of the rake are charged from outside with compressed air or a mixture of air and water in such a way, that it enters through wall openings in feed direction. It also has a covering suspended net (7) of cable bars and cross bars. The plant is a sheet steel construction.
机译:来自水道的水被引导而不会阻塞通过水室。它由一个或多个进气室(2,5)组成,这些进气室拧在现场混凝土基座(1)上。防鱼用耙子(4)可升降地放在中央支架(6)中。耙子的水平空心杆从外部充入压缩空气或空气和水的混合物,使之沿进料方向通过壁孔进入。它还具有一个覆盖的悬吊式电缆网和交叉网(7)。该工厂是钢板结构。

著录项

  • 公开/公告号DE10018072A1

    专利类型

  • 公开/公告日2001-10-25

    原文格式PDF

  • 申请/专利权人 SCHLEICH JOSEF;

    申请/专利号DE20001018072

  • 发明设计人 SCHLEICH JOSEF;

    申请日2000-04-12

  • 分类号E02B9/00;

  • 国家 DE

  • 入库时间 2022-08-22 01:09:51

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号