首页>
外国专利>
TAKE-IN STAGE FOR ELEVATOR FOR CONSTRUCTION WORK
TAKE-IN STAGE FOR ELEVATOR FOR CONSTRUCTION WORK
展开▼
机译:电梯工程施工阶段
展开▼
页面导航
摘要
著录项
相似文献
摘要
PROBLEM TO BE SOLVED: To obtain an elevator stage which has good workability permitting safe assembly and disassembly by installing attaching fittings to beam frames, assembling a stage on the ground and lifting it up to a target story, and pulling it out and fixing to a scaffold erection frame.;SOLUTION: An elevator stage comprises beam frames 1, floor joist frame 2, floor panels 3 or the like. A beam frame 1 is consituted with a frame body with round pipes welded to a rectangular shape, and fixing plates are welded to the right and left of the frame body. Attaching fittings 6 clamps a square pipe secured with a bolt, a slide plate having a slot is welded and stopped with a nut in a state of clamping the fixed plate and is made flexible. The elevator stage assembled on the ground is adjusted to make the overall length of the elevator stage shorter than the interval of the scaffolding. Next, the stage is lifted to the target story and the attaching fittings 6 is pulled out, and the clamp is coupled to a vertical member t of the scaffold erection frame T. In this way, assembly work at a high place can be omitted and safe work can be assured.;COPYRIGHT: (C)2000,JPO
展开▼