首页> 外国专利> CONCRETE PLACING METHOD FOR CAST-IN-PLACE CONCRETE PILE

CONCRETE PLACING METHOD FOR CAST-IN-PLACE CONCRETE PILE

机译:现浇混凝土桩的混凝土浇筑方法

摘要

PROBLEM TO BE SOLVED: To prevent extra-banking concrete from being placed by collecting samples at optional height positions for the placed concrete lifted with the crest, collecting a sample at a pile head section, judging the samples at an early stage to confirm the prescribed quality, and stopping the crest of the placed concrete at the crest position of a pile. ;SOLUTION: When a tremie pipe 3 is used to place concrete 4 in a pile hole 1, a plurality of samples are collected at optional height positions for the placed concrete 4 lifted with the crest, a sample is collected for the concrete 4 at a pile head section (pile crest L0), the early judging method is applied to these samples, the quality of the placed concrete 4 is quantitatively evaluated, and the prescribed quality is confirmed at an early stage. After it is confirmed that the quality of the concrete 4 at the pile head section is the design reference strength or above in particular, the crest of the placed concrete 4 is stopped at the crest position L0 of the pile, and no extra-banking concrete is placed.;COPYRIGHT: (C)1999,JPO
机译:要解决的问题:为防止堆积过多的混凝土,可通过在随波峰升降的已放置混凝土的可选高度位置收集样本,在桩头部分收集样本,及早判断样本以确认规定质量,并在桩的顶部位置停止已浇筑混凝土的顶部。 ;解决方案:当使用特雷米管3将混凝土4放置在桩孔1中时,对于用顶杆提起的已放置混凝土4,在可选的高度位置收集了多个样本,而在顶部1处收集了混凝土4的样本。桩头截面(桩顶L 0 ),对这些样品采用早期判断方法,定量评估所浇筑混凝土4的质量,并在早期确认指定质量。特别是在确认桩头部的混凝土4的品质为设计基准强度以上之后,将浇筑后的混凝土4的顶部停止在顶部4的顶部L 0 上。 ;未放置任何多余的混凝土。;版权所有:(C)1999,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号