PROBLEM TO BE SOLVED: To employ the pulling construction method by installing a rail over the whole length of a slope ground for planned construction, constructing structures for each portion on the rail in a work house provided at the lower end of the slope ground and lifting them upward in sequence. ;SOLUTION: When a building 12 is constructed in the vertical direction on the slope ground 3, a rail is installed over the whole length of the construction planned slope ground 3, and a roofed work house 4 having a lifting facility such as a truck crane 6 is provided at the lower end of the slope ground 3. Structures 7 for one or several spans are constructed on the rail in the work house 4, and the structures 7 are lifted and moved by a fixed distance along the rail by a steel rod, a wire, a jack 9, and a wire winder while deformations are prevented. Succeeding structures are constructed after the structures 7 are moved, and construction and movement are repeated in sequence to complete the whole target building 12. When this pulling construction method is employed, the building 12 having no deformation and excellent in quality can be constructed in a short construction period at low cost.;COPYRIGHT: (C)1997,JPO
机译:解决的问题:采用拉动施工方法,即在整个斜坡地面上安装轨道以进行计划施工,然后在斜坡地面下端的工作间内为轨道上的每个部分建造结构并提升他们依次向上。 ;解决方案:当在坡地3上沿垂直方向建造建筑物12时,在施工计划坡地3的整个长度上安装一条轨道,并安装一个具有起重设施的带顶棚的工作间4,例如卡车起重机在倾斜地面3的下端设置有图6所示的结构。在工作室4的轨道上构造有一个或几个跨度的结构7,通过钢杆将结构7沿轨道提升并移动一定距离。电线,千斤顶9和绕线机,同时防止变形。在移动建筑物7之后构造成功的建筑物,并且依次重复建造和移动以完成整个目标建筑物12。当采用这种拉动建造方法时,可以在建筑物中建造不变形且品质优良的建筑物12。建设周期短,成本低。;版权所有:(C)1997,日本特许厅

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号