BUILDING METHOD OF CONDENSER IN TURBINE BUILDING OF NUCLEAR POWER STATION

机译:核电站汽轮机凝汽器的建造方法

摘要

PURPOSE:To shorten the time interval required for carrying-in and setting of condenser and the work schedule for installing the condenser after starting building of T-G pedestal by carrying in the components of condenser in the form of large blocks and installing the condenser while taking account of building procedure of the T-G pedestal. CONSTITUTION:A large block 20 of condenser, in which a hot well 21 constituting the condenser body, a lower drum 22, an upper drum 23, a supply water heater 24, peripheral units of condenser, piping, etc., are integrated, is assembled in factory, temporary factory at site, or assembling area to semi-complete the condenser which is transferred to a setting place between pedestal legs by means of a large lift upon finish of a T-G pedestal legs 6. Subsequently, T-G pedestal beam is constructed and the condenser body is set.
机译:目的:通过以大块的形式装入冷凝器组件并考虑到冷凝器的安装,以缩短开始冷凝器安装和设置冷凝器所需的时间间隔以及开始建造TG基座后安装冷凝器的工作计划。 TG基座的建造程序。组成:冷凝器的一个大块20,其中集成了构成冷凝器主体的热井21,下部滚筒22,上部滚筒23,给水加热器24,冷凝器的外围单元,管道等。在工厂,现场临时工厂或装配区域进行组装,以使冷凝器半成品,并在完成TG底座支脚6的情况下通过大举升机将其转移到底座支脚之间的固定位置。随后,构造TG底座梁冷凝器主体已安装。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号