首页>
外国专利>
BUILDING METHOD OF CONDENSER IN TURBINE BUILDING OF NUCLEAR POWER STATION
BUILDING METHOD OF CONDENSER IN TURBINE BUILDING OF NUCLEAR POWER STATION
展开▼
机译:核电站汽轮机凝汽器的建造方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
PURPOSE:To shorten the time interval required for carrying-in and setting of condenser and the work schedule for installing the condenser after starting building of T-G pedestal by carrying in the components of condenser in the form of large blocks and installing the condenser while taking account of building procedure of the T-G pedestal. CONSTITUTION:A large block 20 of condenser, in which a hot well 21 constituting the condenser body, a lower drum 22, an upper drum 23, a supply water heater 24, peripheral units of condenser, piping, etc., are integrated, is assembled in factory, temporary factory at site, or assembling area to semi-complete the condenser which is transferred to a setting place between pedestal legs by means of a large lift upon finish of a T-G pedestal legs 6. Subsequently, T-G pedestal beam is constructed and the condenser body is set.
展开▼