首页> 外国专利> Control stretch dead time measurement - uses gps. of measurements for setting and control valves for processing with binary tables

Control stretch dead time measurement - uses gps. of measurements for setting and control valves for processing with binary tables

机译:控制拉伸死区时间测量-使用gps。二进制表处理的设定阀和控制阀的测量值

摘要

To measure the dead time (Tt) of a control value (v(t)) in a control stretch (RS), two gps. of measured values (u(n.Ta),v(n.Ta)) are formed after a given scanning time (Ta). The actual values of a setting value (u(t)) as the 1st gp., and the control value (v(t)) as the 2nd gp. are stored as measured by scanning (n). Two tables are constructed. A binary value is taken according to an increase in a measured value in the 1st and 2nd gp. compared to the direct time-aged measured value in the gp. or in the event of a decrease. A measurement window at the tables gives a selection of positions for the binary values to be compared in pairs to give a sum for the number of pairs with the same binary value. The binary values of one table or the other are shifted towards the time-aged or time-shortened values. The binary values at both tables are again compared at the measurement window to give a 2nd sum of the pairs with the same binary value. The steps are repeated to give sums of the pairs with the same binary value. The max. sum is selected matching the shifts of each table. The shifts are multiplied by the scanning time (Ta) value to give the dead time (Tt) value of the control value (v) as (Tt=r.Ta). USE/ADVANTAGE - The system is used with an assembly to produce and/or work strand, ribbon or web material, or to carry and/or process flow masses and esp. fluids. The method gives electronic computer program control, through process computer control systems, to give a running measurement of the actual dead time of a control value in a control stretch.
机译:要在控制范围(RS)中测量控制值(v(t))的停滞时间(Tt),请使用2 gps。在给定的扫描时间(Ta)之后,形成测量值(u(n.Ta),v(n.Ta))。设定值(u(t))的实际值为第一gp。,控制值(v(t))的实际值为第二gp。存储为通过扫描(n)测量的值。构造了两个表。根据第一和第二gp中测量值的增加,获取二进制值。与gp中的直接计时测量值相比。或减少。表格上的测量窗口为成对比较的二进制值提供了位置选择,以给出具有相同二进制值的对数的总和。一个表或另一个表的二进制值向时限或时间缩短的值偏移。再次在测量窗口比较两个表中的二进制值,以得出具有相同二进制值的对的第二和。重复这些步骤,以给出具有相同二进制值的对的总和。最高选择与每个表的班次相匹配的总和。将偏移量乘以扫描时间(Ta)值即可得出控制值(v)的空载时间(Tt)值为(Tt = r.Ta)。使用/优点-该系统与组件一起使用,以生产和/或加工钢绞线,带状或网状材料,或承载和/或处理流量物质和esp。液体。该方法通过过程计算机控制系统提供电子计算机程序控制,以给出控制范围内控制值的实际停滞时间的运行测量。

著录项

  • 公开/公告号DE4232826C1

    专利类型

  • 公开/公告日1993-10-28

    原文格式PDF

  • 申请/专利权人 SIEMENS AG 80333 MUENCHEN DE;

    申请/专利号DE19924232826

  • 发明设计人 SONST HORST DIPL.-ING. 8521 HESSDORF DE;

    申请日1992-09-30

  • 分类号G06F15/46;G05B19/05;G05B13/02;

  • 国家 DE

  • 入库时间 2022-08-22 05:01:16