首页> 外国专利> Drainage work background of Concrete Dam

Drainage work background of Concrete Dam

机译:混凝土大坝排水工作背景

摘要

A work of drainage base of Concrete Dam which includes a duct Bottom Water in the Dam body with Gates; this contains a block adjacent to the complementary.Background to the downstream side and at the bottom of the block is a supplementary conduit coupled to the Turbine Chamber and the bottom Chamber is located a Hydraulic UnitAnd a Pipe in the ceiling of the Chamber Exhaust Turbine, the entry is made a vain for a SluiceThe upper part of the Supplementary Block represents a Drain Gutter.
机译:混凝土大坝的排水基础工程,包括在带有闸门的大坝主体中的管道底水;以及它的下游有一个辅助管道,该辅助管道与涡轮室相连,底部室位于液压室和排气涡轮顶部的管道中,该辅助管道与涡轮室相连。入口对水闸是徒劳的补充区的上部代表排水沟。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号