CONSTRUCTION METHOD FOR SHEET-LINED REINFORCED CONCRETE SILO

机译:衬板钢筋混凝土筒楼的施工方法

摘要

PURPOSE:To perform safe execution of a work by a method wherein a main bin sheathing board is piled up on and joined with a concreted lower stage main bin sheathing board, a timbering device in the lower stage sheathing board is contracted for closing and lifted up to a given level to timber an upper stage main bin sheathing board, and outer forms are lifted. CONSTITUTION:A main bin sheathing board (a) manufactured on a ground is piled up on the concreted lower stage main bin sheathing board (a) by a crane D for fastening by means of a bolt, and a timbering device (b) disposed inside the lower stage sheathing board (a) is contracted for closing. The device (b) is then lifted up to a given level end temporarily supported to a bracket, and the device (b) is expanded to timber the upper stage sheathing board (a). Silo outer forms (c) are then lifted, the upper and lower ends of the forms (c) are mounted to the sheathing boards (a) by fastening, and concrete is placed in a concreting space formed between the sheathing board (a) and the forms (c) to build a silo body wall. This method performs simple and safe execution of a work.
机译:目的:为了通过将主箱柜板堆放在混凝土下层主箱柜板上并与之连接的方法来安全地执行工作,下层箱柜板中的木工设备应收缩以关闭并提起达到一定水平的木材是上层主箱柜板,并抬起了外部模板。组成:在地面上制造的主料箱护板(a)通过起重机D堆放在混凝土的下部主料箱护板(a)上,以用螺栓固定,并在内部设置木工装置(b)下层护套板(a)收缩以关闭。然后将装置(b)提升到临时支撑在支架上的给定水平端,然后将装置(b)展开以使上层护板(a)木材化。然后提起料仓外部模板(c),通过紧固将模板(c)的上下两端安装到护板(a)上,并在护板(a)和护板之间形成的混凝土空间中放置混凝土。 (c)的形式来建造一个筒仓墙。此方法可以简单安全地执行工作。

著录项

  • 公开/公告号JPH03156074A

    专利类型

  • 公开/公告日1991-07-04

    原文格式PDF

  • 申请/专利权人 FUJITA CORP;

    申请/专利号JP19890293842

  • 发明设计人 MUTO TEISUKE;SUZUKI RYOICHI;

    申请日1989-11-14

  • 分类号A01F25/14;E04G11/28;E04H7/26;

  • 国家 JP

  • 入库时间 2022-08-22 06:04:31