首页>
外国专利>
Method for the formation of a soil and water-retaining wall, soil and water-retaining wall formed in accordance with this method and forming mould for the formation of this soil and water-retaining wall
Method for the formation of a soil and water-retaining wall, soil and water-retaining wall formed in accordance with this method and forming mould for the formation of this soil and water-retaining wall
展开▼
机译:用于形成水土保持壁的方法,根据该方法形成的水土保持壁以及用于形成该水土保持壁的成型模具
展开▼
页面导航
摘要
著录项
相似文献
摘要
the wall is composed of support prefabriques amounts to at least partially (1) and (2) incurvees interposees shell (11).in the concrete floor and cared, or other similar material curable connectees on both sides without seam on the amounts (1). method of formation of the wall surface and / or hold water.according to this method prefabriques amounts (1) are inserted into the ground at a distance from each other, then.for the formation in the soil of a shell incurvee interposee, mould training (5) is introduced into the soil between consecutive amounts (1), and is subsequently removed.a mortar and flows in the cavite under the mold for removal of the latter for the cavite. finally, the invention includes a mold (5) for use in this method.the mould (5) has dimensions such that it can be inserted between the amounts (1) on the fitting.
展开▼