首页> 外国专利> Undersea foundation for an immersed structure - has foundation of sand and gravel excavated under water near site

Undersea foundation for an immersed structure - has foundation of sand and gravel excavated under water near site

机译:沉浸式结构的海底基础-在现场附近的水下挖掘出的沙石基础

摘要

The foundation for a structure on the sea bottom, such as an offshore drilling platform is rapidly and economically installed and its construction process is not affected by rough seas and weather. The granular foundation material, especially sand and gravel is excavated from the sea bottom by excavators (57). This material, excavated in the vicinity of the intended structure site, is subsequently transported to the foundation position by tubes (55). The granular material is sorted before reaching the site. The structure support is not lowered until the foundation material and its covering ballast have been deposited. The last ballast layer is secured with a bonding material.
机译:海底结构(例如海上钻井平台)的基础可以快速,经济地安装,并且其施工过程不受汹涌的海浪和天气的影响。用挖掘机(57)从海底挖出颗粒状的基础材料,特别是沙子和砾石。在预期结构位置附近挖出的这种材料随后通过管子(55)输送到基础位置。颗粒物料在到达现场之前先经过分类。直到基础材料及其覆盖的压载物已沉积,才降低结构支撑。最后的压载层用粘结材料固定。

著录项

  • 公开/公告号DE2543320A1

    专利类型

  • 公开/公告日1977-04-07

    原文格式PDF

  • 申请/专利权人 VOGELRUDOLFDR.-ING.;

    申请/专利号DE19752543320

  • 发明设计人 VOGELRUDOLFDR.-ING.;

    申请日1975-09-29

  • 分类号E02D27/52;E02B17/02;E02D15/00;

  • 国家 DE

  • 入库时间 2022-08-23 00:04:24

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号