首页>
外国专利>
Ground improving device for public works and ground reinforcement method of surface ground or embankmebt ground
Ground improving device for public works and ground reinforcement method of surface ground or embankmebt ground
展开▼
机译:地面改进装置,采用地面或堤防地面的地面加固方法
展开▼
页面导航
摘要
著录项
相似文献
摘要
The present invention relates to a ground improvement device for construction works and a method for reinforcing surface ground or embankment ground using the same. The ground improvement apparatus for construction work of the present invention includes an installation frame 10 installed in the front or rear of the running construction machine 1; A storage tank 20 in which a mixed liquid in which water is mixed with one of a binder or a solidifying material is stored therein, and is installed at one side of the construction machine 1; An upper part is connected to the installation frame 10, and the lower part is formed to be inclined downward toward the ground so as to excavate the ground by the movement of the construction machine 1; A stirring device (40) connected to the installation frame (10), arranged at the rear of the excavation device (30), and configured to stir and mix the excavated field soil through the excavation device (30); An injector (50) installed between the excavation device (30) and the stirring device (40) and connected to the storage tank (20) by piping to inject a mixed solution into the ground excavated by the excavation device (30); It is installed at the rear of the stirring device 40, a flatter 60 for flattening the ground soil agitated by the stirring device 40; is configured to include. According to the present invention, a device for excavating the ground according to driving, supplying solidified material to the excavated ground, mixing the ground supplied with solidified material, and compacting the mixed ground can be driven such as a payloader. By being installed on a construction machine at a time so that the work can be carried out continuously, the construction cost required for the reinforcement treatment of the surface layer can be greatly reduced, and the construction period can be substantially shortened.
展开▼