首页> 外国专利> New Austrian Tunneling Method tunnel reinforcement method using pilot tunnel

New Austrian Tunneling Method tunnel reinforcement method using pilot tunnel

机译:新奥地利隧道法采用先导隧道隧道增强法

摘要

In the present invention, two-stage drilling is performed in the pilot tunnel, but the first expansion excavation range is limited to a large diameter, and the second reinforcement range is limited to a small-diameter drilling range, and a rock bolt is installed at the interface between the large-diameter hole and the small-diameter hole. It relates to a method for reinforcing a natum tunnel line using a pilot tunnel, which consists of pre-strengthening a section with poor rock quality before expansion blasting by fastening a via ring plate.
机译:在本发明中,在先导隧道中进行两级钻孔,但是第一膨胀挖掘范围限于大直径,第二加强件范围限于小直径钻孔范围,并且安装了岩石螺栓在大直径孔和小直径孔之间的界面处。它涉及一种使用先导隧道加强NATUM隧道线的方法,该方法包括预加强岩石质量的剖面,在膨胀爆破之前通过环形板紧固爆破。

著录项

  • 公开/公告号KR102273122B1

    专利类型

  • 公开/公告日2021-07-05

    原文格式PDF

  • 申请/专利权人

    申请/专利号KR1020200142974

  • 发明设计人 정성남;조광은;

    申请日2020-10-30

  • 分类号E21D9/11;B23K31/02;E21D20/02;E21D21;E21D9;

  • 国家 KR

  • 入库时间 2022-08-24 20:05:05

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号