METHOD FOR RESTORING THE GEOPHYSICAL STABILITY OF AN EMERGENCY GROUND DAM ON A WEAK FOUNDATION

机译:恢复紧急磨碎坝地球物理稳定性对弱基础的方法

摘要

FIELD: water engineering. ;SUBSTANCE: invention relates to the field of water engineering and prevention of dangerous hydrological phenomena and can be used to restore the geophysical stability of emergency ground dams on weak water-saturated bases to reduce the risks of man-made floods and floods during breakthroughs of reservoirs protected by ground dams. The method includes the creation of a vertical anti-filtration wall to the bedrock in an emergency ground dam on a weak foundation on the upper side from the crest of the dam, and on the lower side from the latter, the creation of vertical “sand piles” or drains with the connection of their upper sections with an inclined drainage, as well as the creation of a drainage buried in the base along the bottom of the bottom slope of the dam. It is also envisaged to create a vertical highly permeable, discharged cutoff wall from the bottom side of the “sand piles” in the area of the sole of the bottom slope of the dam. ;EFFECT: proposed method makes it possible to increase the reliability of restoring the geophysical stability of emergency protective ground dams of reservoirs on weak water-saturated bases, reduces the likelihood of their breakthrough with the risk of man-made floods and floods. ;2 cl, 1 dwg
机译:领域:水工。 ;物质:发明涉及水工程和防止危险水文现象领域,可用于恢复紧急磨碎坝上的地球物理稳定性,以减少人造洪水和洪水的风险由地面水坝保护的水库。该方法包括在紧急碾压坝上创建垂直的防滤墙,在坝的上侧的弱基础上,从大坝的顶部,从后者的下一侧,垂直的“沙子的下侧桩“或与倾斜排水的上部的连接,以及沿着大坝的底部斜坡的底部的埋入基座中的排水的产生。还设想,从坝底坡的底部底部的“砂桩”的底侧,创造垂直高透水,排出的截止墙。 ;效果:提出的方法使得可以提高恢复疲软水饱和基础储层紧急保护坝的地球物理稳定性的可靠性,从而降低了人造洪水和洪水风险的突破的可能性。 ; 2 cl,1 dwg

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号