首页> 外国专利> Construction method of rotary pile, manufacturing method of pile group, pile group, construction management device of rotary pile, construction management system of rotary pile

Construction method of rotary pile, manufacturing method of pile group, pile group, construction management device of rotary pile, construction management system of rotary pile

机译:旋挖桩施工方法、群桩制作方法、群桩、旋挖桩施工管理装置、旋挖桩施工管理制度

摘要

An object of the present invention is to provide a method for constructing a rotary pile that can prevent damage to the rotary pile. In the method for constructing a rotary pile of the present invention, when the rotary pile provided with blades is penetrated into the ground, the fluctuation amount of the rotary pile and the rotational torque of the rotary pile are included during the rotary press-fitting of the rotary pile into the ground. A measurement process that measures pile information, a comparison process that determines whether the pile is normal or abnormal based on the relationship between rotational torque and eccentricity based on a preset threshold, and conditions for rotational press-fitting of the rotating pile based on the pile information. In the control step, the rotation torque of the rotary pile is reduced, or the rotation is stopped or reversed based on the result of the comparison step.
机译:本发明的目的是提供一种建造旋转桩的方法,该方法可以防止旋转桩受损。在本发明的建造旋转桩的方法中,当带有叶片的旋转桩穿透地面时,旋转桩的波动量和旋转桩的旋转扭矩在旋转桩旋转压入地面期间被包括在内。测量桩信息的测量过程,基于预设阈值的旋转扭矩和偏心率之间的关系确定桩是否正常的比较过程,以及基于桩信息的旋转桩旋转压配合条件。在控制步骤中,旋转桩的旋转扭矩减小,或者根据比较步骤的结果停止或反转旋转。

著录项

相似文献

  • 专利
  • 外文文献
  • 中文文献
获取专利

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号